Fig.#33
Cover
board
Supporting
board
U type hole
Control panel signal wire
Motor assembly signal wire
4. Align control panel in position, the push forward and fasten.
Install motor assembly signal wire and control panel signal
Wire into U type hole of splash plate, as shown below.
Kohler Co. Jan 2018 16 1345889-A02-A
3. Screw two lag bolts into the bracket, as shown. Ensure
the bolts are perpendicular to the wall.
Fig.#32
Supporting bracket
Bolt
Lag Bolt
2. Tighten the four screws to LOCK mark after installing
the supporting board.
Fig.#31
Supporting board
Locknut