Water inlet pipe
Kohler Co. Jan 2018 11 1345889-A02-A
3. Remove the bung from discharge port after finishing the wall preparation, then cut off the excess of square cover
and concealed conduit with a blade.
4. Insert the pan fixing bolts so the washer is hard against the finished wall, notched end outwards for tightening.
NOTE:
1. Ensure the bolt can rotate freely when preparing the wall. The washer should be located outside the wall.
2. When preparing the wall, cross the water inlet hose, control panel signal wire and power cord
through the wall and under the tank.
F. Bowl installation
1. Remove the side panels.
2. Install the discharge pipe and water inlet pipe as shown. Place a ruler on the rear of the discharge pipe and water
inlet, and use a pencil to mark the position. Adjust the space based on the rear of the toilet to wall discharge port.
Concealed conduit
Control panel
signal wire
Bidet water supply
Power supply
cord
Pan fixing bolt hole
Pan fixing bolt
Finished wall
(shown transparent for clarity)
Water tank
mounting bracket
Wall cut-out
Discharge port
Water inlet
Square cover
Bung
Fixing bolt
Power and data cables
Bidet water
supply
Blade
Fig.#16
Fig.#17
Fig.#18
Side Panel
Discharge
pipe