2. Install the Rough Plumbing
NOTE:
Provide access to all plumbing connections to simplify future maintenance.
Locate the rough plumbing for the drain according to the roughing-in dimensions.
NOTE:
If the plumbing will be installed on the unfinished stud wall, install the supplies
after
the
surround walls are installed.
Position the water supplies according to the roughing-in information. Cap the supplies and check
for leaks.
Strap the supply lines to the stud framing.
Install the valves according to the manufacturer’s instructions. Do not install the trim at this time.
Shower Elbow
Blocking
Shower Riser
Supply Valves
Blocking
Spout Elbow
Supply Lines
Optional
Series 7610, 7611
17-1/4"
(438 mm)
8-3/4"
(222 mm)
22"
(559 mm)
76-1/2"
(1943 mm)
1016902-2-F
6
Sterling
Содержание STERLING 7610 Series
Страница 61: ...1016902 2 F ...
Страница 62: ...1016902 2 F ...
Страница 63: ...1016902 2 F ...
Страница 64: ...USA 1 800 STERLING 1 800 783 7546 México 001 877 680 1310 SterlingPlumbing com 2011 Kohler Co 1016902 2 F ...