3
1363166-ML2-B
1.
Installations must comply with all Local/National Water Supply
Authority Regulations/Byelaws, Electrical Regulations and Building
and Plumbing Regulations.
2.
Make sure the tap is installed, commissioned, operated and
maintained in accordance with the recommendations in this guide.
3.
Conveniently situated isolating valves must be provided for
maintenance.
4.
DO NOT
use oil-based, non-setting jointing compounds to make
any connections.
5.
The water pressure for both the hot and cold water pipes should be
equal.
6.
DO NOT
install the tap where it may become frozen.
7. DO NOT
install the tap in an outside environment.
8.
To eliminate pipe debris it is essential that supply pipes are thoroughly
flushed before connecting to the tap.
Battery Operation
6 VDC
Power Supply
100 - 240V AC ~ 50/60Hz
Operating Pressure
0.3 - 10 bar (30 - 1000 kpa)
Flow Volume
3.8 l/Min (3 bar) approx.
Water Temperature
1°C - 60°C
Over Run
(Factory Setting)
1 sec
Fixed Water Flow Duration
2 mins
INSTALLATION GUIDELINES
SPECIFICATION