background image

6

1128227-A01-D   Date: 13/8/2010 

PRODUCT REQUIREMENTS

A. Summary Of Key Requirements

•  Observe all local plumbing codes.

•  

•  Provide properly-dimensioned framing.

•  Baths with airjets are designed for a variety of 

installations, depending upon the model chosen.

between the valves and spout may be required. 

that may inadvertently be used as a means of support 

are not appropriate or safe for this installation. 

D. Product Inspection

Carefully unpack and inspect the bath with airjets 

for damage. Leave all materials in the carton during 

construction to prevent damage.

C. Electrical Requirements

The installation must have a Class A Ground-Fault 

Circuit-Interrupter (GFCI). The GFCI protects against 

Line-to-ground shock hazard. Use a 220-240 V, 10A  

(minimum), 50 Hz dedicated service for the bath with 

airjets.

PRODUCT  NOTICES

WARNING: Risk of electrical shock.  

A licensed 

electrician should make all electrical connections.

WARNING: Risk of electrical shock.  

Connect 

 

only to a circuit protected by a Ground-Fault 

Circuit-Interrupter (GFCI) or Earth-Leakage 

Circuit-Breaker (ELCB).

WARNING: Risk of electrical shock. 

 Disconnect

�����������������������

WARNING: Risk of injury or property damage.

 

Please read all instructions thoroughly before 

beginning installation, including the following 

Product Requirements.

WARNING: Keep the area around the blower 

motor clean and free of debris.

��

Ensure that the 

 

area around the blower motor is free of sawdust, 

insulation, dirt, or other small loose debris. Such 

material could clog the blower motor air ducts and 

cause unsafe operation or affect performance

��

of the bath with airjets.

 Do not relocate the 

system in the absence of kit instructions, as this 

could adversely affect the performance and safe 

operation of the bath with airjets. Kohler NZ shall 

not be liable under its warranty or otherwise for 

personal injury or damage caused by any such 

A. Installation Hazard Notification

B. Plumbing Specifications

INSTALLATION REQUIREMENTS

A. Tools Required

  • Adjustable pipe wrench 

  • Rule

  • Level

  • Safety shoes

  • Safety glasses

  • Square

  • Screwdriver

  • Pliers

  • Utility knife

  • Pencil

  • Measuring Tape

B. Materials Required

•  Plumber’s putty

•  Wall coverings, as 

necessary

•  Silicone sealant

•  Gypsum cement 

(optional)

•  Construction adhesive 

(optional)

•  Protective covering for 

bathtub

•  Nails

•  Silicone Sealant

Plus:

•  Conventional woodworking tools and materials or 

conventional bricklaying tools and materials

•  Drop Cloth 

•  Construction adhesive (optional)

•  Cement or mortar (optional)

•  2x4s or 2x6s

•  PVC Cement

Содержание OVE RECT drop in 1709A-GAB-0

Страница 1: ...10 A 50Hz C Installation Read the entire installation instructions before beginning the installation BEFORE YOU BEGIN BUBBLE MASSAGE BATH INSTALLATION INSTRUCTIONS 1128227 A01 D Date 13 8 2010 Blower...

Страница 2: ...2 REGATTA BUBBLE MASSAGE 11303A GAB 0 1128227 A01 D Date 13 8 2010 OVE BUBBLE MASSAGE 1709A GAB 0 50...

Страница 3: ...3 1128227 A01 D Date 13 8 2010 EVOK BUBBLE MASSAGE 18263A GAB 0 EVOK RECT FREESTANDING BUBBLE MASSAGE 18344A GAB 0 50 837 5 1675 762 408 5 50 36 513 610 81...

Страница 4: ...4 1128227 A01 D Date 13 8 2010 EVOK OVAL BUBBLE MASSAGE 18346A GAB 0 EVOK OVAL FREESTANDING BUBBLE MASSAGE 18348A GAB 0 398 750 50 1700 850 39 50 510 610 398 750 50 1700 850 50 530...

Страница 5: ...5 ESCALE DROP IN BUBBLE MASSAGE BATH 11343A GAB 0 1128227 A01 D Date 13 8 2010 ESCALE FREESTANDING BUBBLE MASSAGE BATH 11344A GAB 0...

Страница 6: ...or property damage Please read all instructions thoroughly before beginning installation including the following Product Requirements WARNING Keep the area around the blower motor clean and free of de...

Страница 7: ...g Install an access panel to allow the pump to be serviced Bath may be installed next to the Bath rim must be fully supported wall or as an island installation Tile Brick or timber B Whirlpool Area Co...

Страница 8: ...TALL THE BATH CAUTION Risk of product damage Do not lift the bath with airjets by the air channels or blower motors or use the air channels or blower motor for structural support of the bath CAUTION R...

Страница 9: ...ion Insert the drain tailpiece into the trap Make sure the bath is level and resting on all support blocks Remove the protective tape from the rim Apply a continuous bead of high quality silicone seal...

Страница 10: ...d with a cord and plug A licensed electrician must install a dedicated GFCI protected 220V 10A grounded outlet Locate the outlet behind the bath and within 610mm of the blower motor Plug the blower mo...

Страница 11: ...im is fully supported Build the bath support frame as shown When the bath is securely positioned before the unit is fully built in install tapware connect plumbing to Run water into the bath and check...

Страница 12: ...Do not use powdered cleaners unless the cleaner is fully dissolved in water Solid substances could block the airjets Do not use bleach or ammonia cleaning solutions Chemically active cleaning solution...

Страница 13: ...move air switch tube and drain C Air switch is faulty or disconnected C Check air tube connections D Blower motor does not work D Replace blower motor 2 Blower motor starts but there are few or no bub...

Страница 14: ...information please visit our website Australia www au kohler com New Zealand www kohler co nz CONTACT AND WARRANTY INFORMATION 1034122 FJ Check Valve Air switch and blower 1128A CP 1122542 80mm Level...

Страница 15: ......

Отзывы: