7. ADJUST OVERFLOW HEIGHT (If
necessary)
Adjust overflow tube so that the top is 20mm above the
waterline. Push locking mechanism to the side and adjust
tube height. Push locking mechanism back into position to
lock tube height.
7.
20mm
1
Maxi
2
6. CONNECT THE SUPPLY
Connect the supply shut-off valve to the supply hose and
connect supply hose to toilet supply shank.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight
tightening of the nuts should stop leakage.
Flush the toilet several times using first one push tutton and
then the other, and check all connections for leaks. Verify
proper operation.
Periodically check for leaks for several days following the
installation.
Adjust the float by the cross-shaped thread and sliding itup or
down on the float rod until the water level is at the marked
water line.
6.
-5-
Supply Shut-Off Valve
Connection
Water
Supply
Hose
Supply
Shut-off
Valve
1089093-T01-H