6
1495657-T2
-A
1.Suggested wire: AC connection wire should with insulated
protecting layer or sleeve and the section should be bigger
than 0.5mm
2
. The section of DC connection wire should be
bigger than 0.3mm
2
. The connection pattern must according
to illustrations above.
2. After wire layout finished, check and repair if needed.
Then connect AC connector of AC/DC transformer to
electrical source from the control box, and DC connector
of AC/DC transformer to control assembly. Turn on AC
electrical power, faucet will be in the period of automatic
adjusting sensing distance (about 30 seconds). The faucet
will not work during this period.
1.
建议交流电源线采用带绝缘和护套层的电线,导
体标称截面积
0.5mm
2
;直流连接线采用导体标
称截面积
0.3mm
2
的电线。请严格按照上图进行
连接。
2.
排线完毕后,应检查并确保所有排、接线无误,
再分别连接电源盒
AC
接线端与排线管内交流接线
端,以及电源盒
DC
接线端
(
黑橙线接头
)
与控制组
件的电源线接插件(从阀盒内引出的电线).最 后
打开
AC
电源,龙头进入
30
秒自动调距阶段,
此过程龙头不会出水。
2.
安装直流电池盒组件
Install DC power unit assembly
1.
取出电池盒组件
,
旋松螺钉
(17),
按电池盒盖
(18)
上的正负极标示装
入
4
节
5
号电池,紧锁电池盒盖
(18)
注意:
电池极性不能装反,新旧电
池不能混用。
的螺钉
(17)
后。
1.
18
18
17
4
17
18
Install Batteries
3.
接线并固定控制盒组件
Cabling and fix the control box
电源盒组件
Power unit assebly
1.
将交流或直流电源盒组件放入
控制盒内。
1. Assemble AC or DC power unit
assembly into control box.