7
INSTALLATION REQUIREMENTS
the front of this guide, and the requirements detailed in this section before
installing the shower.
WARNING - TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR INJURY:
Plumbing
1. #
"
2. ["
3. [1533
""2
4. #"
56""
@3
""*\6
!,!1:2
5. #
a pressure relief valve. It must be positioned over a water catchment area with
"
6. #,"
7.
DO NOT
8.
DO NOT
9. #
10. #
use the showerhead must not spray directly on to the shower unit.
11.
DO NOT
" "
!-(
12. #*<
13. !+
""!
wall structure.
14.
DO NOT
use any other
Содержание Mira Sport Thermostatic 9.0
Страница 1: ...1 These instructions must be left with the user Installation Guide Mira Sport Thermostatic 9 0 9 8 kW ...
Страница 22: ...22 NOTES ...
Страница 23: ...23 NOTES ...