background image

18

3.6

To assist in marking the positions of
the fixing holes, reverse the shower
valve and fit the building in shroud
through the cutout in the front of the
panel. Mark the positions of the M5
fixing holes in the two top brackets

only

.

Important! 

Make sure that the correct

holes are used (refer to illustration).

Warning! Do not drill any holes for
the bottom securing bracket.

3.7

Drill the two 5 mm holes for the fixings
(countersink the holes at the front).

3.8

Remove the building-in shroud (retain
the screws for later use).

3.9

Secure the shower valve (positioned
from the rear of the panel) with the
M5 x 40 mm fixing screws (refer to
illustration).

3.10

Fit the hot and cold supply pipes and
tighten the compression nuts.

Caution!

 Make sure that the olives are

fitted and all pipework is flushed
through before connecting to the
shower control.

3.11

Fit the outlet pipework, leaving enough
pipe through the wall to temporarily cap
off.

3.12

Turn on the water supplies and check
for leaks.

3.13

Fit the shower fittings, refer to your
fittings installation and user guide for
instructions.

3.14

Fit the concealing plate and control
assembly, refer to section: 

‘Control

Assembly’

.

Securing Screws

M5 Fixing
Holes

Warning!

 Do not

drill or screw here.

Содержание Mira Discovery

Страница 1: ...1 These instructions are to be left with the user Installation and User Guide SHOWER VALVE BUILT IN DUAL CONTROL...

Страница 2: ...Stud Partition Using Securing Brackets Mounting off Front Face 12 2 Solid Wall or Stud Partition Using Rear Fixing Points on Shower Control 15 3 Laminated Panel Using Securing Brackets Mounting off R...

Страница 3: ...ibleandassuch cannottotallyreplaceasupervisor svigilancewhere that is necessary Provided it is installed commissioned operated and maintained withinmanufacturersrecommendations theriskoffailure ifnote...

Страница 4: ...to confirm that the parts are included PACK CONTENTS 1 x Shower Valve fitted to the Building in Shroud 3 x Compression Nuts 3 x Olives x Flow Regulator 12 litres per minute 1 x Hexagon Key 3 x Mounti...

Страница 5: ...5 DIMENSIONS Note All Dimensions are Nominal Pipe Centres 186 mm 47 mm 64 82 mm 108 mm 231 mm 27 mm...

Страница 6: ...set Blend Shower 43 C Optimum Thermostatic Control Range 35 C 45 C Achieved with supplies of 15 C cold 65 C hot and nominally equal pressures Max Hot Supply 85 C Recommended Hot Supply 60 C 65 C Min D...

Страница 7: ...ed refer to sections Installation and Reversed Supplies Inlets 15 mm Compression Outlet 15 mm Compression Thermostatic Shut down Thermostat will shut off Hot Supply Within 2 Seconds if Cold Supply Fai...

Страница 8: ...dulating design Note Flow regulator recommended to be installed refer to the Discovery Fittings Installation and User Guide However it is possible following installation of a flow regulator that the f...

Страница 9: ...e installed on the floor next to the hot water cylinder Note Flow regulator recommended to be installed refer to the Discovery Fittings Installation Manual Mains pressurised instantaneous hot water sy...

Страница 10: ...the valve inlets 5 Inlet and outlet threaded joint connections should be made with PTFE tape or liquid sealant Do not use oil based non setting joint compounds 6 To eliminate pipe debris it is essenti...

Страница 11: ...ring Brackets go to section Installation 1 Solid Wall or Stud Partition Using Securing Brackets Mounting off Front Face For installation from the front face into a Solid Wall or Stud Partition using t...

Страница 12: ...ows and install on opposite sides Secure the elbows with the grub screws Note Make sure that the filter plugs are positioned to the front i e hexagonal key facing forward 1 4 Mark the route for the ou...

Страница 13: ...llations alternative fixings may be required not supplied Important At this point position the building in shroud onto the shower valve and make sure that it is horizontal and will be parallel to the...

Страница 14: ...inimum and maximum limits otherwise the control components will not fit correctly 1 16Remove the building in shroud Retain the three securing screws for securing the backplate 1 17Fit the shower fitti...

Страница 15: ...depend on the finished wall thickness e g tiles or facia board Refer to the table for this measurement For stud partitions depth X refers to the distance from the rear mounting e g wooden baton to th...

Страница 16: ...ive fixings may be required not supplied to fix the shower valve to the rear face of the wall cavity or to a timber noggin Important At this point position the building in shroud onto the shower valve...

Страница 17: ...t the hole cutout will be horizontal and vertical 3 3 Carefully cut out the laminated panel and make sure that the building in shroud fits inside the hole cutout 3 4 Fit the securing brackets to the s...

Страница 18: ...ater use 3 9 Secure the shower valve positioned from the rear of the panel with the M5 x 40 mm fixing screws refer to illustration 3 10Fit the hot and cold supply pipes and tighten the compression nut...

Страница 19: ...the seal is fully compressed on the finished wall surface Note If the finish is particularly uneven i e due to grout lines apply a small amount of silicone sealant to ensure a seal Caution Do not over...

Страница 20: ...You will need to push the concealing plate up and over the lip on top of the backplate refer to illustration 8 Clip the bottom of the concealing plate into position 9 Align the temperature control kno...

Страница 21: ...O Key supplied onto the cartridge nut and turn anticlockwise Unscrew and pull the cartridge clear from the body Note Depending on the finished wall thickness it may be necessary to remove the backplat...

Страница 22: ...e Caution When resistance is felt do not use force to turn any further as this can damage the internal parts 6 Once the desired maximum blend temperature has been achieved refit the temperature hub an...

Страница 23: ...TION Note IfexcessiveflowrateisexperiencedfromtheShowerControl installthesupplied Flow Regulator refer to the Discovery Fittings Installation and User Guide OFF ON COLD HOT Flow Control Lever Temperat...

Страница 24: ...nced and sufficient d Make sure the inlet temperature differentials are sufficient e Check the thermostatic performance f Flow regulator fitted incorrectly Refer to Note below g Airlock or partial blo...

Страница 25: ...ubstances and should not be used for cleaning plated or plastic fittings These finishes should be cleaned using a mild washing up detergent or soap solution rinsed and then wiped dry with a soft cloth...

Страница 26: ...C Flow Control Assembly 1609 043 D Flow Control Housing 1609 044 E Non Return Valve 2 off 1609 045 F Screw Pack not illustrated 1609 046 G Filter Pack 2 off 1609 047 H Seal Pack not illustrated 1609...

Страница 27: ...27 J A B C C K J D D D E G I L K J...

Страница 28: ...28 7 5 1058366 W2 A 1609 Kohler Mira Limited February 2006 CUSTOMER SERVICE...

Отзывы: