3. Route the Wiring
Recess-Mount Installation
Drill a 3/4
″
(19 mm) hole into each side of the framed cavity, located 4-5/8
″
(117 mm) from the
bottom of the cavity.
Route the GFCI/RCD receptacle and dimmer switch wires through the holes in the framing.
The wiring should extend at least 20
″
(508 mm) from each hole.
Surface-Mount Installation
Drill two 3/4
″
(19 mm) holes for the electrical wire locations.
Route the GFCI/RCD receptacle and the dimmer switch wires through the holes in the finished
wall.
The wires should extend at least 20
″
(508 mm) from each hole.
20"
(508 mm)
20"
(508 mm)
Ø 3/4"
(19 mm)
Recess-Mount Installation
Surface-Mount Installation
Ø 3/4"
(19 mm)
4-5/8"
(117 mm)
Kohler Co.
7
1337913-2-A
Содержание K-99003-TLC
Страница 62: ...1337913 2 A ...
Страница 63: ...1337913 2 A ...
Страница 64: ...USA Canada 1 800 4KOHLER México 001 800 456 4537 kohler com 2018 Kohler Co 1337913 2 A ...