3. Install the Power Data Supply
Orient the PDS box within the service closet or access panel to
allow room for cover removal and connecting the cables. If
possible, connect the cables through the side holes rather than
those on the cover to avoid complicated cover removal for
servicing.
If installing the PDS within a 2x6 stud cavity, position it to the far
left of the cavity to allow room for connecting the cables to the
side holes.
Attach the PDS to structural framing or other secure surface using
standard wood or drywall screws (not supplied). Mounting
boards may need to be installed between stud framing.
Route the Chroma data cable from the PDS to the media module
or steam adapter.
Route the Chroma power cable from the PDS to the overhead rain
panel location.
Kohler Co.
9
1078520-2-A