8. Install the Pipe Nipples and Light Panel
Remove the nipples.
Apply thread sealant to the threads of the nipples.
Reinstall the nipples to the tees/elbows.
Run water through the system to flush out any dirt or debris.
Attach the pre-routed chroma power cable to the light panel
assembly.
Insert the light panel into the rough opening of the finished
ceiling.
Pipe Nipple
Finished
Ceiling
Chroma
Power Cable
Light Panel
Assembly
Kohler Co.
15
1078520-2-A