3. Complete Remaining Cuts
CAUTION: Risk of personal injury.
Always wear safety glasses while cutting.
Temporarily secure the wall jambs to the side walls of the finished opening with masking tape.
Orient the wall jambs so the screw holes face the inside of the shower and the
″
Top
″
label is at the
top.
Carefully measure the distance (B) between the top of the wall jambs. Mark this distance on the
header and expander.
Carefully measure the distance (C) between the bottom of the wall jambs. Mark this distance on the
threshold.
Cut along the inside of the marked line to cut the header, expander, and threshold to length.
Use a file to remove any burrs where the cuts were made.
Threshold
Header
Header
Expander
B
C
Left Wall
Jamb
Pre-drilled Holes
on Inside of Shower
Outside of Shower
Right
Wall Jamb
Shower
Ledge
Measure distance "B" and "C".
Kohler Co.
5
1144162-2-A
Содержание K-705800
Страница 62: ...1144162 2 A ...
Страница 63: ...1144162 2 A ...
Страница 64: ...USA Canada 1 800 4KOHLER México 001 800 456 4537 kohler com 2010 Kohler Co 1144162 2 A ...