background image

1380417-T01-A

-4-

INSTALLATION

安装

STEP

7

STEP

8

STEP

9

STEP

10

1. Check that the stopper is properly installed and then install the internal and the external 

hinge covers.

1. 

检查铰链限位件是否已预装好,确认后扣上铰链内外侧盖板;

Install the internal cover while opening the door 

outward.

Install the external cover while opening the door 

inward.

门往外打开时,装好铰链内侧的盖板;

门往内打开时,装好铰链外侧的盖板。

Door opened inward

门往内打开状态

Stopper

铰链限位件

Check if the stopper is correctly and securely 

installed when installing the cover

在安装铰链外盖时,

 

检查铰链限位件是否安装

好,以确保无脱落

1. Install the magnetic seal and the weather bar.

 

IMPORTANT:

 Install the hinge cover before the side weather bar.

1. 

装好磁条,挡水胶条。

 

重要:

在安装侧挡水胶条前,先扣好铰链盖板。

Cut the bubble seal according to the actual 

height of the glass to avoid the installation 

positions of the hinges

泡泡胶条需根据实际玻璃高度剪断,用以避开铰

链安装位置

Install the waterproof part before the side 

weather bar

防水密封件在安装侧挡水胶条前须装好

Install the bottom weather bar assembly

门底挡水胶条组件安装

1. Install decorative covers on all jambs.

2. Install the handle assembly onto the door glass.

1. 

将型材装饰盖全部装好;

2. 

将把手组件安装在门玻上。

1. Apply glass cement both inside and outside as shown in the figure below.

1. 

按下图所示,在淋浴房里外都打上玻璃胶。

Install the handle onto the door 

glass

将把手安装在门玻上

Decorative top cover for the inter glass

扣夹固玻型材装饰盖

Decorative cover for the 

inter glass

夹固玻型材装饰盖

Содержание K-701803T-FMSW

Страница 1: ... the floor drain runs smoothly Before starting the door installation lay out and identify all the parts Use the exploded view illustrated on page 2 for reference For the installation method of customized shower with different dimensions please refer to this instructions The product complies with QB 2584 2007 警告 可能有人员伤害或者产品损坏的危险 钢化玻璃不能进行切割 钻孔或硬物敲击 搬移或安装 过程中 小心确保玻璃边 角部位不受撞击 以防爆裂 伤人 建议 将本产品安装在科勒淋浴盆或挡...

Страница 2: ... Seal Bottom Door 固玻底下装饰胶条 Components Handle 艺廷拉手 Door Glass Components 门玻 Magnetic Seal 磁条 Side Panel Glass L Shape Components 侧固定玻璃 Cover Wall Jamb 墙立柱装饰盖 Wall Jamb L R Insert Glass 夹固玻墙立柱 L R End Cover Solid Glass Wall Jamb 夹固玻墙立柱端盖 X2 X2 X2 X4 X4 X1 X1 X1 X1 X1 X1 X1 Side Panel Glass Clamp Assy 侧固玻拉杆玻璃夹组件 Components Handle 艺廷拉手 Briquetting 下导轨固定件 Cover Wall Jamb 墙立柱装饰盖 Cover Briquetting Decora...

Страница 3: ...调节 Be careful of the orientation of the taper ring 注意锥形孔圈方向 Taper ring 锥形孔圈 Observation hole 观察孔 Set screws 紧定螺钉 Rubber washer 焊片胶垫 1 Insert the insert seal between the inner side of the panel glasses and the jambs 2 Loosen the lock screws on the inside of the hinge Insert the adjusting mechanism into the opening of the glasses make sure that the plastic cover and the plastic washers on both sides...

Страница 4: ...he weather bar IMPORTANT Install the hinge cover before the side weather bar 1 装好磁条 挡水胶条 重要 在安装侧挡水胶条前 先扣好铰链盖板 Cut the bubble seal according to the actual height of the glass to avoid the installation positions of the hinges 泡泡胶条需根据实际玻璃高度剪断 用以避开铰 链安装位置 Install the waterproof part before the side weather bar 防水密封件在安装侧挡水胶条前须装好 Install the bottom weather bar assembly 门底挡水胶条组件安装 1 Install decorative co...

Отзывы: