![Kohler K-3900X Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/kohler/k-3900x/k-3900x_installation-manual_1990034008.webp)
1195109-X2-A
8
Kohler Co.
Prepare the Installation Location
IMPORTANT!
Risk of product damage.
If there are T-bolts extending from the flange, remove them. T-bolts
are not required for this installation.
IMPORTANT!
Because of the unique design of this toilet, the width of the bottom edges of the toilet will vary.
The following steps are required because of this variation.
¨
Cut out the inside of the flange area on the template along the dotted line.
¨
Position the template with the hole positioned over the flange. It is critical that the centerlines marked on the
template are centered on the flange.
¨
Secure the template to the floor with tape.
¨
Confirm the template is correctly positioned and centered over the flange.
¨
Position the toilet on the template. Make sure the front of the base of the toilet is aligned with the markings
on the template.
¨
Confirm the left/right position of the toilet left or right so that an equal amount of shaded area is visible
on each side of the template.
¨
Directly under the screw holes on each side of the toilet, accurately mark the bottom edge of the base.
The mark should intersect the lines labeled ″C″ and ″A″ or ″B″ on each side of the template.
Template
Screw Hole
Center the toilet
on the template.
Top View
Tape
Flange
Flange Centerlines
Содержание K-3900X
Страница 34: ...1195109 X2 A 34 Kohler Co ...
Страница 35: ...Kohler Co 35 1195109 X2 A ...