Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
CAUTION: Risk of personal injury or product damage.
Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
DANGER: Risk of electrical shock.
Connect to a properly
grounded, grounding-type receptacle, protected by a
Ground-Fault Circuit-Interrupter (GFCI).
A dedicated 120 VAC, 15 A, 60 Hz circuit (protected by a Class A
GFCI) is required for installation.
NOTICE:
The Canadian Electric Code requires receptacles installed
in bathrooms to be located at least 1 meter from a bathtub or
shower if practical, but in no case less than 500 mm. If the
installation is in Canada, install this unit in accordance with the
Canadian Electrical Code, Part 1.
Observe all local plumbing and building codes.
Carefully inspect the new toilet for damage.
If the existing toilet does not have a supply shut-off valve below
the tank, install one before installing the new toilet.
10" Adjustable
Wrench
Supply
Shut-Off
Valve
Tape
Measure
Tubing Cutter
Safety
Glasses
Hacksaw
Sponge
Level
Plus:
• 5/16" T-Bolts w/ Nuts and Washers
• Putty Knife
• Screwdriver
• Electrical Tools and Supplies
• Metal File
Wax Seal
1021799-2-B
2
Kohler Co.