background image

2

114543-2-

CB

Kohler Co., Kohler, WI

IMPORTANT INSTRUCTIONS

READ AND SAVE FOR THE CONSUMER

WARNING:  Risk of scalding or other severe injury.

Before completing installation, the installer must set the maximum
water temperature setting of this valve to minimize the risks associated
with scalding hazards according to ASTM F 444.

Do not install a shut-off device on either outlet of this valve. The
installation of any such device may create a cross-flow condition at the
valve and affect the water temperature.

Factors that change the temperature of the water supplied to the valve,
such as seasonal water temperature changes, and water heater
replacement or servicing, will change the maximum water temperature
supplied by the valve and may create a scalding hazard. The
pressure-balanced valve will not compensate for changes in the water
supply temperature; adjust the maximum water temperature setting of
this pressure-balanced valve when such changes occur.

Pressure-balanced valves may not provide protection against scalding if
there is a failure of other temperature-limiting devices elsewhere in the
plumbing system.

The installer is responsible for installing the valve and adjusting the
maximum water temperature of this pressure-balanced valve
according to instructions.

This valve meets or exceeds ANSI A112.18.1M and ASSE 1016.

If you do not understand any of the installation or temperature adjustment
instructions in this document, in the United States please contact our
Customer Service Department at 1-800-4-KOHLER. Outside the U.S.
please contact your distributor.

IMPORTANT

Please fill in the blanks below and on the valve label. Then

insert these instructions into the plastic bag included with the valve
package, and attach the plastic bag to the valve handle for the owner’s
reference.

This device has been preset by ______________________
of _______________________ to ensure a safe maximum
temperature. Any change in the setting may raise the
discharge temperature above the limit considered safe,
and lead to scalds. Date: _____________

Содержание CORALAIS BODYSPA K-1096

Страница 1: ...ower Pay special attention to this feature when planning your site preparation Avoid excessive heat if you solder connections to prevent damage to the fitting Flush all piping thoroughly before installing the valve Observe all local plumbing codes Do not force the handle s in any direction To turn the valve off gently turn to the Off position For the K 1097 do not use any plastic pipe between the ...

Страница 2: ... valve when such changes occur Pressure balanced valves may not provide protection against scalding if there is a failure of other temperature limiting devices elsewhere in the plumbing system The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure balanced valve according to instructions This valve meets or exceeds ANSI A112 18 1M and ASS...

Страница 3: ... IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 3 Fig 1 10 4 72 78 TO FLOOR TYPICAL SUPPORT FRAMING K 1097 MODEL ONLY Determine the installation location of both valves the showerhead and the spout Install the support framing as required IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 4 Fig 2 10 4 72 78 TO FLOOR TYPICAL 48 TO FLO...

Страница 4: ...he K 1098 reinstall the aspirator at the top of the yoke Do not overtighten For the K 1097 discard the aspirator Reinstall the valve units with the colored dot valve on the left side right side for ceiling supplies Reinstall the plaster guards For K 1096 model proceed to Fig 6 For K 1097 model proceed to Fig 7 Fig 5 Ceiling Supplies Aspirator Hot Cold D shape Down D shape Up INSTALL 2 HANDLE YOKE ...

Страница 5: ... 2 Copper or Pipe 1 2 Adapter or Solder Direct Hot Side Shower Outlet 1 2 Pipe Cap INSTALL SINGLE CONTROL VALVE K 1097 MODEL CAUTION Risk of product damage The shower valve contains plastic components Do not apply excessive heat if you solder the valve connections NOTE If the valve is to be installed in a two valve back to back configuration proceed to Back to Back Installation procedures on Page ...

Страница 6: ... out for thick wall installation Install the plaster guard and mud guard over the cap assembly and secure them to the valve body with screws NOTE The finish wall must line up within the front to back depth of the installed plaster guard The plaster guard may be removed after the wall is completed Remove and discard the mud guard Thin Wall Installation Cut a 4 diameter hole in the wall material Ide...

Страница 7: ...he temporary nipple from the bath ell Apply thread sealant to the threads of a 1 2 nipple Install the nipple to the bath ell so it extends 3 7 8 beyond the finish wall Carefully thread the spout to the nipple with a clean strap wrench Flush hot and cold water through the spout for one minute Fig 13 3 7 8 Nipple N P T Spout INSTALL SHOWER ARM AND SHOWERHEAD ALL MODELS CAUTION Risk of product damage...

Страница 8: ... counterclockwise to shut the water off Reinstall the handle and face plate O Ring Upper Limit Stop Tab Valve Stem Lower Limit Stop Groove Fig 16 7 INSTALL VALVE TRIM INSTALL ESCUTCHEONS TO 2 HANDLE YOKE ALL MODELS Apply a bead of plumbers putty or other sealant to the escutcheon according to the putty manufacturer s instructions Install the escutcheons over the threaded sleeves and align on the w...

Отзывы: