14. Seal the Enclosure
IMPORTANT!
For better adhesion success, allow the wall panels and locker unit to cure 24 to 48 hours
before sealing. Sealing the top or bottom will restrict the air flow, resulting in a longer curing time.
Apply color matched silicone sealant to the top seams where the wall panels and locker unit meet
the rough wall.
Apply sealant to the bottom seams where the wall panels and locker unit meet the bath or shower
base.
NOTE:
Wait 24 hours before showering or running water.
Remove the tape from the locker unit once the adhesive and sealant on the locker unit and wall
panels have cured.
Kohler Co.
19
1248925-2-C
Содержание 97631-G9
Страница 65: ...1248925 2 C...
Страница 66: ...1248925 2 C...
Страница 67: ...1248925 2 C...
Страница 68: ...USA Canada 1 800 4KOHLER M xico 001 800 456 4537 kohler com 2015 Kohler Co 1248925 2 C...