![Kohler 1250-2250 kW Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/kohler/1250-2250-kw/1250-2250-kw_operation_1989773066.webp)
TP-6161
1/12
66
Section 6 Accessories
6.2 Accessory and Prime Power
Terminal Strip Connections
(DEC 3+)
The 16-light controller circuit board has terminal strips
for use in connecting a controller connection kit. Do not
connect accessories directly to the controller terminal
strip(s).
Connect accessories to either a controller
connection kit or dry contact kit. Connect the dry contact
kit(s) to the controller connection kit. Connect alarms,
battery
chargers,
remote
switches,
and
other
accessories to the dry contact kit relay(s).
The 16-light controller has two terminal strips, TB1 and
TB2, on the controller circuit board, and prime power
choices are made on TB2.
See Figure 6-35 for
controller
configurations.
See
Figure 6-36
and
Figure 6-37 for controller terminal strip identification.
See Figure 6-38, Figure 6-39, and Figure 6-40 for
accessory connection wiring diagrams.
Lower the controller circuit board panel until it is lying flat
when connecting the dry contact kits to the controller
TB1 terminal strip.
Route dry contact relay leads
through the controller grommet and guide loops to the
circuit board terminal strip. Place the controller circuit
board panel flat to ensure adequate slack in the dry
contact relay leads.
For specific information on
accessory connections refer to the accessory wiring
diagrams in the Wiring Diagram Manual and the
instruction sheet accompanying the kit.
Note:
Not all terminals are used for all generator sets
(see appropriate wiring diagrams for specific
generator set models).
Note:
To use the prime power mode, use jumpers to
connect TB2-1P to TB2-2P, TB2-3P to TB2-4P,
and TB2-3 to TB2-4. To deactivate the prime
power mode, remove these jumpers.
1
2
3
P1
P2
A-336415-A
R41
LED4
1. TB1 (TB1A) terminal strip
2. TB2 terminal strip
3. TB3 (TB1B) terminal strip
Figure 6-35
TB1 and TB2 Terminal Strips on the
16-Light Controller
Terminal
Purpose
1P
Prime power operation.
2P
Prime power operation.
3
Remote start ground. Connect transfer switch or
remote start switch to TB2--3 and TB2--4.
3P
Prime power operation.
4
Remote start. Connect transfer switch or remote
start switch to TB2--3 and TB2--4.
4P
Prime power operation.
9
Crank mode selection (open: cyclic crank, ground:
continuous crank). Connect TB2--9 to TB2--9A for
continuous cranking; leave TB2--9 open cyclic
cranking; see starting instructions in Section 2,
Operation.
9A
Crank mode ground.
Figure 6-36
16-Light Controller TB2 Terminal Strip
Содержание 1250-2250 kW
Страница 27: ...TP 6161 1 12 27 Section 3 Scheduled Maintenance ADV 7600B B Figure 3 6 Gas Fuel Connections Wiring Diagram...
Страница 38: ...TP 6161 1 12 38 Section 3 Scheduled Maintenance Notes...
Страница 57: ...TP 6161 1 12 57 Section 6 Accessories Figure 6 19 RSA Wiring Connections GM62554A G...
Страница 58: ...TP 6161 1 12 58 Section 6 Accessories Figure 6 20 RSA Wiring Connections GM62554B G...
Страница 59: ...TP 6161 1 12 59 Section 6 Accessories Figure 6 21 RSA Wiring Connections GM62554C G...
Страница 60: ...TP 6161 1 12 60 Section 6 Accessories Figure 6 22 RSA Wiring Connections GM62554D G...
Страница 61: ...TP 6161 1 12 61 Section 6 Accessories Figure 6 23 RSA Wiring Connections GM62554E G...
Страница 68: ...TP 6161 1 12 68 Section 6 Accessories Figure 6 38 Accessory Connections 328912A H...
Страница 69: ...TP 6161 1 12 69 Section 6 Accessories Figure 6 39 Accessory Connections 328912B H...
Страница 70: ...TP 6161 1 12 70 Section 6 Accessories Figure 6 40 Accessory Connections 328912C H...
Страница 75: ......