3. Add Reinforcement (If Applicable)
Finished-Deck or Rim-Mount Installation
NOTICE:
Plywood is required for rim-mount installations to secure
the spout supply tube. Follow the bath instructions to correctly cut
and position the plywood.
NOTICE:
Make sure the plywood will not interfere with other
plumbing connections or installation of the bath.
Install 1/2
″
(13 mm) exterior grade plywood if the finished deck
or rim is less than 1/2
″
(13 mm) thick, or if the faucet will be
installed directly to the bath rim.
Rim
1/4" (6 mm)
Min
1/2" (13 mm)
Exterior Grade
Plywood
Finished
Deck
1/4" (6 mm)
Min
1275145-2-A
6
Kohler Co.