5. Operations
q
Install the ION WIPER on the stable and flat location, then connect the power supply,
grounding, air tubing and exhaust duct.
w
Open the main valve of air unit (purchased and installed by the customer) and adjust the
regulator of the Ionizer. Adjust the supplied air pressure for the Ionizer in the range of 0.05 to
0.5MPa.
e
Set the blowing time by using the selector switch for lonizer operating time on the back of the
main body, according to the charged condition of the workpiece and amount of dust.
Selector switch for lonizer operating time
(ionized air blow time)
Time to set for ionized air blow
1S:to blow for one sec.
2S:to blow for two sec.
HOLD:to blow continuously
r
Turn the power on. Check to ensure that the indicator for the workpiece detecting sensor turns
on, then place a work. The sensor detects that the workpiece is positioned and starts
operation. (DTY-WC□-L starts operation when either of the sensors (right or left) detects the
workpiece.)
To increase
pressure
To decrease
pressure
Lock
Releasing lock
-
15
-
Содержание ION WIPER DTY-WC-L
Страница 12: ...Memo 21 ...