Koehler K2269X Скачать руководство пользователя страница 16

K2269X Low Temperature Pressure Viscometer 

Operation and Instruction Manual 

 

K2269X-Manual

    

 

-

12-

 

 

 

Figure 13. Standard Piping Connection_2 

 

11. 

Using  the  quick  connect  coupling  that  comes 
attached  to  the  pressure  gauge,  connect  a 
pressure  gauge  to  the  top  of  the  standard 
piping assembly. Refer to 

Figure 9

.  

 

NOTE:

  The  proper  gauge  to  be  used 

depends 

on 

the 

equilibrium 

pressure 

determined  by  the  type  of  grease  during 
testing. Generally, it is recommended to begin 
with  the  5000psi  maximum  gauge  when  the 
theoretical  pressure  is  unknown  so  as  not  to 
damage smaller range gauges.  

 

12. 

Access the Receiver Chamber

 (Figure 2, Item 

3)

  and  insert  a  thermocouple  into  the  grease 

sample  through  the  thermocouple  ferrule  at 
the bottom of the grease cylinder.  

 

13. 

Connect the Thermocouple port to the Sample 
Temperature  Display  input  located  in  the 
Receiver  chamber.  See 

Figures  14  and  15

Once  this  connection  is  established  the 
Sample  Temperature  Display  on  the  Control 
Box 

will 

display 

the 

grease 

sample 

temperature.  

 

 

 

Figure 14. Thermocouple Connection 

 

 

 

Figure 15. Thermocouple Connection_Close Up 

 

14. 

The grease cylinder loading procedure is now 
complete.  Before  attaching  a  capillary, 
changing  the  flow  of  the  hydraulic  fluid  and 
starting a  test,  the  sample  grease  must  attain 
temperature equilibrium with the test chamber. 
The time to attain temperature varies with the 
grease being tested, however the user should 
expect  a  wait  time  of  approximately  2  hours 
prior to equilibrium and start a test.  

 

5.5  Testing Procedure 

 

1. 

Prior  to  performing  the  testing  procedure, 
confirm  that  the  grease  sample  temperature 
has  come  to  equilibrium  with  the  chamber 
temperature.  

 

2. 

Attach  Capillary  No.  1 

(Figure  1,  Item  B)

  to 

the  bottom  of  the  grease  cylinder  via  the 
receiving  chamber 

(Figure  2,  Item  3)

  and 

tighten using a wrench provided.  

 

3. 

Press  the Gear Switch 

(Figure  4, Item 15)

  to 

simulate the 40-tooth gear speed.  

 

4. 

With  the  Grease  Cylinder  properly  connected 
to the hydraulic system connection point and a 
pressure  gauge  connected  to  the  grease 
cylinder  assembly  the  flowing  hydraulic  fluid 
can  be  redirected  to  the  grease  cylinder  to 
build pressure for testing.  

 

5. 

Open  Right-Hand  Needle  Valve 

(Figure  3, 

Item 10)

.  

 

6. 

Close  Left-Hand  Needle  Valve. 

(Figure  3, 

Item 8)

.  

 

7. 

Observe the pressure gauge connected to the 
grease  cylinder.  Pressure  will  begin  to 
increase  until  an  equilibrium  pressure  is 
obtained. Record the pressure.  

 

Содержание K2269X

Страница 1: ...enue Bohemia New York 11716 1796 USA Toll Free 1 800 878 9070 US only Tel 1 631 589 3800 Fax 1 631 589 3815 http www koehlerinstrument com e mail info koehlerinstrument com Petroleum Testing Analysis...

Страница 2: ......

Страница 3: ...tured in conformance with the applicable standards set forth in this certification Specifications ASTM D1092 This unit is tested before it leaves the factory to ensure total functionality and complian...

Страница 4: ......

Страница 5: ...tion 5 4 1 Instrument Descriptions 5 4 2 Top Assembly Description 5 4 3 Control Box Descriptions 6 4 4 Gear Box and Motor Descriptions 7 4 5 Temperature Controller Descriptions 7 5 Operation 9 5 1 Ref...

Страница 6: ...pport of your laboratory testing needs Our products are backed by our staff of technically knowledgeable trained specialists who are experienced in both petroleum products testing and instrument servi...

Страница 7: ...t may exhibit potential hazards Any user must be familiarized with the possible dangers before use We also recommend consulting the Material Data and Safety Sheet MSDS on each chemical reagent for add...

Страница 8: ...e unit and all accessories for damage If any damage is found keep all packing materials and immediately report the damage to the carrier We will assist you with your claim if requested When submitting...

Страница 9: ...ar pump gears drive motor required to power the hydraulic system Refer to section 4 4 for detailed descriptions on this section of the apparatus 4 2 Top Assembly Description Figure 3 Instrument Descri...

Страница 10: ...nect the grease cylinder to the hydraulic system This port is also used as the main connection point for the hydraulic system calibration by utilizing the Calibration Pipe Assembly See Figure 1 Item G...

Страница 11: ...n See Figure 4 item 13 Variable Speed Motor is coupled to the speed reducer and is capable of operating at two speeds required to simulate flow rates attained by 40 tooth gear and 64 tooth gear as per...

Страница 12: ...a certified calibrated measuring device to acquire the temperature Calculate the difference between the measuring device and the Process value displayed on the controller b Press the program key two t...

Страница 13: ...ion instructions for the temperature controller NOTE Allow for the test chamber to cool and come to temperature equilibrium prior to turning on Drive Motor Recirculating Pump See Figure 4 Item 13 It m...

Страница 14: ...imed 11 Once a steady flow or constant drip rate is observed the hydraulic system is primed and free of air bubbles 12 Using the relief valve at the right hand side of the calibration piping assembly...

Страница 15: ...esting purposes If not attached ferrule will be in thermocouple packaging 3 Remove bottom cap from Grease Cylinder F 4 Invert grease cylinder and place Grease Cylinder Piston C inside Grease Cylinder...

Страница 16: ...cylinder loading procedure is now complete Before attaching a capillary changing the flow of the hydraulic fluid and starting a test the sample grease must attain temperature equilibrium with the test...

Страница 17: ...may result in personal injury or death If you have any questions about maintaining your equipment then please do not hesitate to contact the Koehler technical service department 6 1 Routine Maintenan...

Страница 18: ...104 002 Fuse 25A Slo Blo 5X20 M M 220 240 013 Cartridge Heater 500W 240V 265 500 001 RTD Temperature Probe x 12 275 103 044 Temperature Controller 100 240V 288 230 018 Motor 208 230V 3 Phase 288 230 0...

Страница 19: ...K2269X Low Temperature Pressure Viscometer Operation and Instruction Manual K2269X Manual 15 7 Wiring Diagrams 7 1 220 240V 50Hz Unit Wiring K22695...

Страница 20: ...e the return of the product to the factory The sole responsibility of Koehler Instrument Company and the purchaser s exclusive remedy for any claim arising out of the purchase of any product is the re...

Страница 21: ...K2269X Low Temperature Pressure Viscometer Operation and Instruction Manual K2269X Manual 17 Notes...

Страница 22: ...K2269X Low Temperature Pressure Viscometer Operation and Instruction Manual K2269X Manual 18 Notes...

Отзывы: