background image

 USER MANUAL CENTRAL HEATING STATION TYPE C32SPV24MEFB; C32SPV31MEFB; C22SPV23MEF

 

 

REV.12.06.2017

 

 

 

      

8 of 19

 

 

8.5

 

 Connecting pipe of the safety valve 

Caution! 
Danger of hot water burns! 

The connecting pipe of the pressing of the safety valve is connected to the drain pipe to the sewage system.  
Otherwise, there is always the risk of flooding, for which the manufacturer of the central heating station is not responsible.  
 

8.6

 

Air/ burnt gases input/ output pipes 

The  central  heating  station  does  not  use  the  air  in  the  room  where  it  is  placed  or  adjiacent  rooms.  To  ensure  the  efficient 
functioning  of  the  central  heating  station  is  recommended  that  the  air  necessary  for  burning  is  taken  from  the  outside  of  the 
building. 

Caution! 

The kit will obligatorily have a 3% incline (approximatively 2°) to be able to eliminate the condensation towards the 
exterior.  

It is obligatory to place central heating stations in rooms with proper ventilation systems according to applicable norms. 

 
Danger! 

It is completely forbidden to use the central heating station without the burnt gases output pipes because it endangeres 
people’s life and health of people. 

Installation is to be performed only by authorized personnel following applicable laws. 
 

Caution! 

In order to obtain the efficiency guaranteed by the producer, while observing the limits of the compounds resulting from 
the burning gases, it is necessary to install the membranes delivered with the central heating station. 

 

8.7

 

Electric grid connection 

The central heating station must be connected to one-phase network of 230V - 50Hz with protection null. 
Dispersion withstand  of  the  earthing  switch  (earthing)  must  comply with applicable  norms  (maximum  4  ohm, and  the working 
null must not have residual current).  
Electric  powering  of  the  central  heating  station will  be  executed  from  a  separate  circuit  provided with  differential  protection 
fuses of 30 mA. 
External connections must comply with applicable norms. Connection to the electric grid of the building must allow the entire 
electric insulataion of the central heating station for situations when interventions are required. 
Grid connection is done taking into account the symbolism of colours as follows: 

Brown

 = phase, 

Blue

 = null, 

Green and Yellow

 = 

earthing. 
The current plug must be accessible so that the user can easily disconnect it. 
 

Caution!  

It is not allowed to mount the central heating station with a defective electric installation or with no earthing. 
Danger of death by electric shock with electric contacts! 
 

8.8

 

Installation filling and emptying  

The following operations are executed to fill the installation: 
- ellectrically power the central heating station; 
- open the filling tap (fig. 1.4) of the central heating station 
and of the thermal/ house water installation; 
- load the boiler with a pressure of about 0.4 bar, indicated on 
the display; 
- open the pump air vent; 
- activate the boiler ventilation module to vent the system: 

press the J7(

)  key for activation and the pump will start, 

the boiler is in the OFF (Stand-by) state, to deactivate it press 

the J7(

)  or by turning on the POWER button; 

- Adjust the pump operation (5, 6 or 7m) depending on the 
installation (see chapters 8.3 and 11);  
- continue to fill the system, with the ventilation function 
switched on up to 

1.1-1.5 bar

;

                                                                                                                                                                              *figure contains ERP pump

 

- check the tightness of the entire system. If there are losses, the problems must be remedied; 
In the case of plants equipped with automatic ventilation: keep the pump on until noises are heard in the installation; 
In the case of plants without automatic ventilators: manually operate the manual air vent to remove the air from the main 
exchanger until noises are heard in the installation; 
- heat the radiators; 
- Make 2-3 cycles of 50-60 seconds of air-venting, following the steps described above; 
- check the system pressure indicated on the display. If necessary, fill with thermal agent following the above steps. 
- Remove the flexible hose. 
If necessary, fill with thermal agent following the above steps. 
 
 
 
 
 
 
 

Fig. 1.4 

Water filling tap 

OPEN 

Содержание C22SPV23MEF

Страница 1: ...t depending on the area and the purchase period KÖBER SRL no 25 Vaduri Al Tel 40 233 24 17 46 233 24 19 33 www motan ro KÖBER SRL VADURI BRANCH USER MANUAL GAS BOILER C32SPV24MEFB C32SPV31MEFB C22SPV23MEF Alexandru cel Bun Commune Neam 233 24 19 33 Fax 40 233 24 19 29 eamt 617511 Romania ...

Страница 2: ...aphic context functioning state 11 9 2 7 Graphic context adjustment of functioning parameters 11 9 2 8 Graphic context Service submenu 12 9 3 Central heating station startup 12 9 4 Functioning as waste hot water station WHW 12 9 5 Functioning as heating station HS 12 9 6 Preset functions related to station safety 12 9 7 Setting additional functions 12 9 8 Error signals 13 9 9 Station switch off in...

Страница 3: ...t not be used by people with limited psychological and sensitive capacities including children or by people with no experience or and no knowledge The station provides both heating in closed circuit central heating installations as well as hot water Use for other purposes or for additional purposes other than stipulated is considered inappropriate use The manufacturer is not responsible for possib...

Страница 4: ...rmal circuit 0 5 3 5 bar Maximum pressure on DHW circuit 8 bar Temperature on thermal circuit 30 80 C Temperature on the floor heating system circuit 15 45 C Temperature on domestic hot water circuit 35 55 C Hot water flow t 30 C 10 l min Electric characteristics Input 230VAC 50 Hz Rated power EEI pump 0 2 80 W Construction characteristics Height 700 mm Width 436 mm Depth 306 mm 328 mm 306 mm Weig...

Страница 5: ...ly in rooms with maximum 60 humidity between 20 30 C in order to prevent the damaging of electronic components Caution The burning air of the station must not contain substances such as flourine vapours chlorine sulphur dissolvants colorants adhesives or gasoline These substances can lead in time to the corrosion of the equipment and air gas incoming outgoing pipes Legend A Thermal input connector...

Страница 6: ...allation of the central heating station in the proximity of a swimming pool washing machine or cleaner can result in the contamination of the burning air with these compounds Water pH must be within the following limits 7 5 pH 9 5 It is recommended to check the water and thermal agent pH frequently and if the value does not fall within the limits provided by the manufacturer it will be treated aga...

Страница 7: ...filter on the return of the thermal circuit installation When installing connecting pipes it is essential for these not to be tensed to avoid creating areas of leakage Maximum working pressure allowed is 3bar Recommended working pressure is 1 5 bar Caution It is forbidden to use the central heating station without thermal agent or partilally filled danger of explosion It is forbidden to use the ce...

Страница 8: ...ions must comply with applicable norms Connection to the electric grid of the building must allow the entire electric insulataion of the central heating station for situations when interventions are required Grid connection is done taking into account the symbolism of colours as follows Brown phase Blue null Green and Yellow earthing The current plug must be accessible so that the user can easily ...

Страница 9: ...damage of the main switch of the station Incorrect airing of the installation can cause damage of the main heating switch Note Recommended pressure on the thermal circuit is 1 5 bars Emptying the central heating station Emptying of the station implies the following turn off the station by pressing Power si switch off the electric power close the gas tap close the thermal tap and the cold water inp...

Страница 10: ...parameter in the installation submenu Used to decrease the set temperature on hot water circuit or the value parameter in the installation submenu Used to switch the station on off Used to reset the electronic control board from an error state Used to change the functioning mode winter summer Used to activate deactivate the light on the display Description of graphic symbols in the LCD display Des...

Страница 11: ...tallation is 1 4 bar working mode is summer and the temperature in the installation is 17 C 9 2 6 Graphic context functioning state This state is associated with the presence of flame or the functioning of the circulation pump of the station In this state all the activating state elements of the central heating station are active and the burning request is accepted The display shows the delivered ...

Страница 12: ...HW request has priority over the heating request in the winter mode The station can function as instant WHW or as accumulation boiler WHW the boiler is functioning of the station as an accumulation boiler WHW station please contact an authorised service company In intant regime the minimum flow of hot water detected by the station is 2 4 l min For confort in using the station as a WHW station we r...

Страница 13: ...ESET E25 YES BCU malfunction Manually resettable by pressing RESET E30 YES Malfunctioning burnt gases sensor Manually resettable by pressing RESET E31 NO Malfunctioning thermal input sensor Manually resettable by pressing RESET when the cause disappears E32 NO Malfunctioning thermal output sensor Manually resettable by pressing RESET when the cause disappears E35 NO Malfunctioning external tempera...

Страница 14: ...is signed table 2 by which the user signs that they are aware of the correct way of using the central heating station This statement is also signed by the authorized person who commissioned the central heating station The authorised person who commissions the station has the right to refuse to sign the station commissioning statement if they notice defects of the local connecting installations and...

Страница 15: ...B C32SPV31MEFB C22SPV23MEF REV 12 06 2017 15 of 19 11 Drawings necessary for mounting and installation 11 1 Types of configurations for mounting for mural central heating stations with forced flue C32SPV24MEFB C32SPV31MEFB C12 C22 C32 C72 C82 C42 C52 C62 ...

Страница 16: ...e 300mm B distance over the window ventilation hole 300mm C distance left right to the window ventilation hole 300mm D E distance from the roof gutter 250mm F distance from the garage roof balcony 250mm G distance to vertical gutter 250mm H distance to internal external corners 250mm H distance to windows doors 300mm I distance to ground balcony 300mm J distance over the door 600mm L distance to t...

Страница 17: ...c curve Pump error codes If the pump has detecte one or more errors the bi colour LED 1 changes from green to red When an error is active LEDs indicate the type of error as presented in table 7 If more alarms are active at the same time LEDs show the rror with the highest priority Tab 7 Pump error codes 11 5 Hydraulic characteristic of non ER P pump Q PUMP FLOW mc h Display Meaning Pump action Rep...

Страница 18: ...32SPV31MEFB C22SPV23MEF REV 12 06 2017 18 of 19 11 6 Functioning schemes covered by warranty 11 6 1 Central heating with radiators and instant preparation of domestic hot water 11 6 2 Underfloor central heating and instant preparation of domestic hot water ...

Страница 19: ...SPV31MEFB C22SPV23MEF REV 12 06 2017 19 of 19 11 6 3 Central heating with radiators and accumulated preparation of domestic hot water accummulation boiler 11 6 4 Underfloor central heating and accumulated preparation of domestic hot water accummulation boiler ...