7170 Jog Lever
Kobelt Manufacturing Co. Ltd.
Rev B
MNL_7170
10 of 24
4
C
OMMISSIONING
4.1
E
LECTRICAL
C
HECK
Ensure that the rear cover is installed and secured before powering
on the 7170.
•
Confirm that the electrical connections to the 7170 have been made.
4.2
F
UNCTIONAL
T
EST
The Functional Test should be carried out while the vessel is still at
dock and before it is taken out to sea after installation has been
completed.
A complete functional test should be performed on the system that the Jog Lever has been
installed within before entering operational use.