knightgroup
.co.nz
Page 5
Assembly Instructions
E
G
Step 6
* Install Desktops
Insert caps
G
into cross beams
E
, and test operation.
Any top supplied for this unit will be a universal top and will
require the installer to correctly position & pre-drill before
fixing it to the frame.
Cubit Shared Highrise Desk
E
G
B2
B1