KMB SMY-CA Скачать руководство пользователя страница 9

2. enter time and date value, valid at the time of end of editing.

3. select if instrument uses

Summer Time

option.

4. choose the valid

Time Zone

5.

Time Synchronization

is usually not required.

Now the instrument is configured and is ready to be used in typical application.

2.6

Downloading data to PC

Connect the instrument to the PC and run ENVIS.Daq application. Select the appropriate communication

option and connect to the instrument. In the next screen press

Refresh All

. This will load and display the actual

status of each supported archive.

Device Information

section contains editable description and name under which the actual record is stored.

Time Frame for Other Archives

tab allows you to limit the date ranges of all archives by the time interval of the

main archive. In the

Destination

section the actual storage can be selected - either to the SQL database or to

the file. The check boxes in

Archives to Download

determines which specific archive(s) you want to download.

The actual download will start by pressing the

Download All

button. progress is displayed on screen. When

finished the archive can be viewed in the ENVIS application. User can open the downloaded file directly from

ENVIS.Daq.

2.7

Energy meter readings

SMY-CA has an embedded three phase, four-quadrant energy meter with automatic meter reading functions and

multiple programmable tariffs (Time-of-Use, TOU). The instrument registers active energy (EP, EP+, EP-) and

reactive energy (EQL, EQC or EQC+, EQC-, EQL+, EQL-). According to the configuration of meter readings

are shuffled to the respective tariffs. It automatically provides summaries per phase. For star connections and

single phase measurements it can also register energy for each phase separately.

Readings can be displayed on the instrument screen. Basic hierarchy is shown on the fig. 6 — button

Â

enters the main instrument menu, use buttons

Ã

and

Ä

) to navigate to electricity meter icon, press button

Â

again and enter the meter reading screen (fig. 6a). Meter data readings can be downloaded and analyzed in

ENVIS or via the standard ModBus protool in any other system.

8

Содержание SMY-CA

Страница 1: ...CA 2 2 2 Instrument overload warning 2 2 3 Installation 2 2 3 1 Connection step by step 3 2 3 2 Disconnection 4 2 3 3 Communication peripherals 5 2 4 Lock unlock the instrument 5 2 4 1 Locking the in...

Страница 2: ...ptions is specially designed to be used only in combination with provided external current sensors which are supported with the respective option SMY CA is based on SMY 133 panel power meter and share...

Страница 3: ...ected to the parts which are under dangerous voltage it is necessary to comply with all the necessary measures to protect users and equipment against injury with electrical shock Person performing the...

Страница 4: ...enerally the current sensors are interchangeable But for better orientation we recommend to respect their marking connect the brown sensor to the L1 current input the black one to the L2 input and the...

Страница 5: ...After recording of measurement for the desired period of time has been completed it is necessary to disconnect the instrument from the points of measurement and transfer the data recorded to a compute...

Страница 6: ...lock the instrument so as to prevent any unwanted modifications of its configuration by aliens 2 4 1 Locking the instrument 1 press the button in the default start screen 2 choose lock unlock symbol...

Страница 7: ...s 5 multifunction buttons located under the display area its actual function is dynamic and is symbolized by a pictogram on the lower edge of the screen above each button fig 3 For intention of use in...

Страница 8: ...l Config screen is displayed 7 select Connection Type according to the physical connection of the instrument 8 insert correct value of voltage and current transformer ratio according to the used VT an...

Страница 9: ...specific archive s you want to download The actual download will start by pressing the Download All button progress is displayed on screen When finished the archive can be viewed in the ENVIS applicat...

Страница 10: ...tarif and sums EP EQL EQL EQC a EQC and single phase L1 L2 and L3 values respectively 3 Technical Specifications 3 1 Basic Parameters Instrument Auxiliary Power Supply Voltage 100 275 VAC90 350 VDC po...

Страница 11: ...acy 2 seconds per day backup battery capacity 5 years without supply voltage applied weight max 0 3 kg EN 61000 4 2 4kV 8kV EN 61000 4 3 10 V m up to 1 GHz EN 61000 4 4 2 kV EN 61000 4 5 2 kV EN 61000...

Страница 12: ...balance measuring range 0 10 measuring uncertainty 0 3 THDU measuring range 0 20 measuring uncertainty 0 5 reference conditions measuring range measuring uncertainty twice the levels of class II acc t...

Страница 13: ...measuring uncertainty THDI 100 0 6 THDI 100 0 6 of rdg Temperature internal sensor measured value affected by the instrument power dissipation measuring range 40 80 C measuring uncertainty 2 C INOM IB...

Страница 14: ...ctive Reactive Power Power Factor PF cos PNOM UNOM x INOM reference conditions A ambient temperature tA U I for active power PF cos for reactive power 23 2 C U 80 120 UNOM I 1 120 INOM PF 1 00 PF 0 00...

Страница 15: ...nstrument less than 10 A If the cell is empty it is necessary to ship the instrument to the manufacturer for battery replacement Service in the case of failure or a breakdown of the product you should...