Klingenburg KR4 Скачать руководство пользователя страница 2

3

2

1. Function of the controller

 

We have only two controllers for all rotor sizes:

KR4 = 400 Watt – for wheel diameter ≤ 3760 mm

KR7 = 750 Watt – for wheel diameter >3760 mm

Special features:

 

 the controllers are usable worldwide

 

  all known regulations are taken into account by us 

for construction of the controller

 

  it is therefore the most modern generation of con-

trollers by far

 

  the controllers are operated using only three but-

tons. The results and messages are displayed in a 
lighted, two-part display

 

  In hardwired condition, the controller is immediately 

ready to operate after turning on the mains voltage

 

  Faults are shown in the display  

  most modern processor technology
  CE tested
  housing IP 54
  short-circuit proof outlet
  EN 55011 tested
  EN 61000-3 tested
  EN 61000-4-2 tested
  EN 61000-4-3 (burst) tested
  EN 61000-4-4 (surge) tested
  EN 61800-3 tested
  every individual module is tested

  detailed fault message
  thermal contact monitoring
  two-line, colourful display lit by LCD
  operating message
  start-up and discharge circuit
  menu-driven programming
  clear text display on LCD
  three button operation
  processing of signals from other 

controllers

  self cleaning cycle

Optionally available accessories:

 rotor run control including function display
 priority rpm (adjustable)
 analogue output (0 - 10 Volt =)
 resistor evaluation (PTC)

Accessories used with the Z-controller

 Summer operation including function display

 

  Enthalpy comparison

 

  Temperature comparison

 

  Temperature switchover

 Supply air temperature regulation
 Sequence switchover including function display
 Rotor run control including function display

Содержание KR4

Страница 1: ...N E R G Y R E C O V 1 Function of the controller 2 Terminal connections 3 Technical data 4 Initial operation 5 Manual mode external mode 6 Trouble shooting and fault messages 7 Safety and precautions...

Страница 2: ...short circuit proof outlet EN 55011 tested EN 61000 3 tested EN 61000 4 2 tested EN 61000 4 3 burst tested EN 61000 4 4 surge tested EN 61800 3 tested every individual module is tested detailed fault...

Страница 3: ...ly voltage of 24 Volt on the contacts 5 7 9 and optional 14 3 Technical data Controller typ KR4 KR7 Output 0 4 kW 0 75 kW Fuse internal 6 3 A delay 5 x 20 mm 10 A delay 5 x 20 mm Mains voltage 220 240...

Страница 4: ...z C o n t r b l o c k e d P l e a s e w a i t Navigating through the menu items You can choose between English and German Other menu languages are available upon request The change is made by activat...

Страница 5: ...g cycle ensures that the rotor moves regularly in a half rotation if no request comes from the controller signal or keypad for longer than 20 minutes 0 5 S t a r t p o i n t F r e q u e n c y 8 0 H z...

Страница 6: ...t f r e q 4 0 H z N o m f r e q 4 0 H z If the following image should appear instead Check the following table of errors Search method for KR4 KR7 base controller no display is visible test the fuse c...

Страница 7: ...r overloaded 09 Mains under voltage 14 Earth fault 15 Mains overvoltage 21 Overtemperature in the power amplifier environmental temperature too high controller overloaded 99 Software error The control...

Страница 8: ...restart is activated To avoid injury from possible uncontrolled restart of the fre quency converter after a power outage install a switch element on the grid side that de energises in a power outage a...

Страница 9: ...Klingenburg GmbH Boystra e 115 45968 Gladbeck Germany Tel 49 20 43 96 36 0 Fax 49 20 43 7 23 62 E mail klingenburg klingenburg de www klingenburg de E N E R G Y R E C O V E R Y DNKR4 7 Status 01 14...

Отзывы: