Klimawent SMART-SN Скачать руководство пользователя страница 13

Klimawent

 – the warranty of highest quality at attractive price 

 

 

 

18.06.2020

 

Roof fans SMART-SN

 

13 of 15

 

 

OPERATIONAL USE 

The 

SMART-SN

 fans design enables the device to work without constant operation in continuous operation.  

To start the fan, use (see above – Table 6): 

 

RS

 type motor starter, 

 

WS

 type motor breaker, 

 

FA/3

 inverter. 

 

The choice of how to start SMART-SN fans depends on many factors, such as the power of the 
electric motor, nature of the motor frequency control, type of motor overload protection, etc.

 

Incorrect  use  does  not  take  into  account  the  manufacturer's  disclaimers  (see  item  3  "MANUFACTURER'S 

DISCLAIMER") and is considered improper (see item 2 “APPLICATION”). Improper use may cause damage to 
the  motor  bearings,  loss  of  balance  of  rotating  elements,  the  appearance  of  excessive  vibrations,  impeller 
deformation, damage caused by friction, and ultimately destruction of the fan. 

 

TROUBLESHOOTING GUIDE 

If  you  notice  any  signs  of  device  malfunction  (e.g.  increase  in  noise,  vibration,  reduced  performance), 

disconnect the fan from the power supply and check for the cause of the interference. Common disorders and 
their causes are presented below – see – Table 8. 

Table 8 Typical disturbances and remedies 

Disturbances

 

Possible causes 

Remedies 

no possibility to start the fan 

failure of one phase or too 

low voltage or blocked impeller or 

damaged motor 

supply voltage, check electrical 

protection, remove impeller blocking 

object, replace motor with new one 

the appearance of vibration 

and vibration of the fan 

object obstructing the fan 

disconnect the fan from the power 

supply, remove the engine cover and 

remove the object 

rotor damage 

replace the impeller with a new one 

poor efficiency 

wrong rotor rotation direction 

change the impeller rotation direction 

by changing the phase order 

loud fan operation 

destruction of engine bearings 

replace the engine with a new one 

distortion of impeller inlet parts 

and friction 

replace deformed elements 

 

MAINTENANCE AND RECYCLING INSTRUCTIONS 

 

Maintenance 

The design of the fan enables continuous operation, provided that it is used correctly and periodic inspections 

and maintenance are carried out.  

 

The user carries out checks and general maintenance on his own! 

At least every 

12 months

, check the technical condition of the fan and the motor following the principles of 

operating electric drive devices. 

Inspections of the fan may be performed by a qualified person with appropriate qualifications and only after 

disconnecting the device from the power supply. To disconnect the fan from the main circuit, a 

service switch

 is 

used, the purchase, installation, and placement of which is the responsibility of the fan user. 

Service switches

 

from 

KLIMAWENT S.A.

 offer as optional equipment - see above, Table 6. 

As part of the fan check, check the following. If necessary, remove the fan from the roof base: 

A.

 

Check the correctness and accuracy of tightening the mechanical and electrical connections. 

B.

 

Check the condition of the impeller and the inside of the fan and detect and remove accumulated dirt 
or foreign bodies. 

C.

 

Check  the  alignment  of  the  impeller  relative  to  the  inlet  fitting  (equal  distance  over  the  entire 
circumference between the impeller inlet and the fan inlet fitting). 

D.

 

In case of vibration or noise during fan operation, measure the vibration and checking that there is no 
contact between the rotating impeller components and the inlet sleeve or other housing components. 

Содержание SMART-SN

Страница 1: ...AL USE 13 TROUBLESHOOTING GUIDE 13 MAINTENANCE AND RECYCLING INSTRUCTIONS 13 OHS MANUAL 14 TRANSPORT AND STORAGE 14 TERMS OF WARRANTY 14 EXAMPLE OF EC DECLARATION OF CONFORMITY 15 18 06 2020 Manufactu...

Страница 2: ...f 6 4 2011 page 8 Regulation of the Polish Minister of Economy of 21 October 2008 on requirements for machines Journal of Laws No 199 of 2008 item 1228 Also meets the requirements of the following har...

Страница 3: ...vacuum Pa Synchronous rotation rpm Motor rate kW Supply voltage V Hz Mass kg SMART 160 3000 SN 813W30 2 300 740 3000 0 55 3 400V 50Hz 16 SMART 200 3000 SN 813W33 3 550 800 0 55 16 SMART 250 3000 SN 81...

Страница 4: ...SMART 1500 SN roof fans 100 200 300 400 500 600 700 800 900 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Static pressure Pa Flow rate m3 h SMART 160 3000 SN SMART 200 3000 SN SMART 250 3000 SN...

Страница 5: ...cs of SMART 1000 SN roof fans part 2 of 2 200 225 250 275 300 325 350 375 400 0 500 1000 1500 2000 2500 3000 3500 Static pressure Pa Flow rate m3 h SMART 200 1000 SN SMART 250 1000 SN 0 100 200 300 40...

Страница 6: ...0 1000 630 1000 710 1000 400 750 500 750 630 750 710 750 1m 79 79 80 80 74 75 80 85 67 65 68 73 78 84 87 63 69 77 81 5m 70 69 70 70 64 66 70 75 56 56 59 62 68 74 77 55 59 67 71 10m 62 62 63 63 57 58 6...

Страница 7: ...cy point 3 Efficiency category 2 Measurement category 1 Overall efficiency Product information Table 4 Energy performance of roof fans SMART SN not supplied with the fan see chapter no 9 MAINTENANCE A...

Страница 8: ...ss G 2 5 Each SMART SN fan is equipped with an inlet with a round flange with holes which allows the fan to be mounted with threaded fasteners see below Picture 2 and Table 3 The top side of the fans...

Страница 9: ...N SMART 630 1000 750 SN 843P47 TPD 710 N SMART 710 1000 750 SN TPDC N 843P50 TPDC 160 N SMART 160 3000 SN 843P51 TPDC 200 N SMART 200 3000 1500 1000 SN 843P52 TPDC 250 N SMART 250 3000 1500 1000 SN 8...

Страница 10: ...g roof bases of appropriate sizes and TK type channel silencers The use of a sound absorbing roof base reduces the noise reaching the room by approx 12 18dB A SMART SN fans should be transported on a...

Страница 11: ...er supply remove the fan cover to gain access to the motor junction box After completing the connections replace the fan cover Diagram 1 Star motor connection Y Diagram 2 Triangle motor connection SER...

Страница 12: ...in the immediate vicinity 3 Set the motor protection to 1 1 electric current at the fan duty point with a limit not exceeding It 1 1 In where In is the rated motor current Control and commissioning B...

Страница 13: ...bject rotor damage replace the impeller with a new one poor efficiency wrong rotor rotation direction change the impeller rotation direction by changing the phase order loud fan operation destruction...

Страница 14: ...operating assembling electrically connecting commissioning and service repairs comply with safety regulations standards and generally accepted technical rules Due to the presence of sharp edges and c...

Страница 15: ...ment and of the Council of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy related products recast Official Journal L 285 of 31 10 2009 page 10 Commission...

Отзывы: