
11
30.01.2019
extraction rail
ERGO-KOS-AL
9.
Maintenance
The maintenance consists in following steps:
● In order to obtain appropriate capture efficiency of the suction hood, clean its surface and
the inlet wire-mesh net from the deposited dusts and impurities.
In case of welding dusts, additionally
– sprinkle the hood with an anti-spattering liquid to
avoid adhering / clinging the welding chippings.
● In case when the extraction arm is losing its self-supporting properties – undertake adust-
ment of its frictional brakes (to regain self-locking function of the joints).
● Lubricate the swivel every 3 months, using solid grease (lubrication nipple is located in
the swivel flange).
● After 1 operational year, submit the device to a technical revision and repair or replace
the faulty element.
● Clean the internal surfaces of the extraction conduits (segment ducts) from the deposited
impurities. Revision frequency depends on the operational intensity.
Every three months, it is recommended to examine the pollution state of the discharge
conduits and clean them when relevant
.
10.
Occupational Health and Safety
The ERGO extraction arms will not cause any risk provided that they are firmly and correctly
mounted to the wall or another structural element of the building.
Unsure installing could cause uncontrolled detachment of the device
and cause severe hazard to personnel / people in the vicinity
.
Start-up and maintenance are exclusively possible after getting acquainted with the contents
of the present Use and Maintenance Manual.
For the safety reasons, connect the device to the power supply system according to the being
in force regulations within the range of personal protection against the electrical shock and the
short-circuit- and overload effects.
Any activities related to device connection to the power supply system
should to be performed by an authorised person with qualifications.
Maintenance and repairs should be executed after the appliance is switched off and dis-
connected from the power supply system.
It is important to control the impeller rotation sense of the fan, it should be according to the ar-
row on the housing (for 230/400V; 50Hz only). Having completed the work, leave the extrac-
tion arm in the ultimate operational position, in case when it constitutes barrier to User / per-
sonnel in the vicinity, set the arm into home position.
11.
Transport and Storage
For the time of transport the duct segments are in packages to protect them from mechanical
damage.
Extraction arms are conveyed in a partly assembled state, in special packages. The devices
ought to be stored in dry rooms and areas of efficient ventilation.
The transport / reloading ought to eliminate the hazard of damage, scratching, indents of the
elements of the system.
Pay attention that the packages would not get damaged, and the markings on
the surface would not get obliterated or detached.