Operating Instructions and Installation
3-17
• After checking, read the owner’s instructions care f u l l y, and perform a test operation. Then deliver
the unit to the customer.
(When delivering the unit, be sure to read carefully and follow the contents of the owner ’ s
i n s t ru c t i o n s . )
3-2-4(b) Test Operation
Caution
1. Be sure to check whether the service valve is opened before attempting to perform
the test operation.
2. Never attempt to start test operation by force pressing the electronic contactor as
it is very dangerous.
(This is very dangerous as the protective device does not work.)
3. Be sure to perform the test operation after installment.
It is easy to start the test operation in winter if you increase the sensor temperature to
23°C ~ 25°C by holding the indoor temperature sensor. (Cooling operation)
Temperature Sensor
Содержание KFH28PV2
Страница 4: ...2 2 2 2 Dimensions Indoor Unit Outdoor Unit unit mm 330...
Страница 26: ...Disassembly and Reassembly 4 5 No Parts Procedur e Remark...
Страница 35: ...6 1 6 Exploded Views and Parts List 6 1 Indoor Unit...
Страница 37: ...6 3 6 1 1 ASS Y COVER FRONT Exploded Views and Parts List...
Страница 39: ...6 5 6 1 2 ASS Y GRILLE INLET Exploded Views and Parts List...
Страница 41: ...6 7 6 2 Outdoor unit 19 18 14 1 16 17 15 7 6 9 11 13 12 8 2 4 5 19 1 19 2 10 3...
Страница 46: ...8 1 8 PCB Diagrams 8 1 Ass y Main PCB CODE NO DB93 10531B...
Страница 48: ...8 3 8 2 Ass y Power PCB Code No DB93 10532B...
Страница 51: ...9 1 9 Wiring Diagrams 9 1 Indoor Unit...
Страница 52: ...9 2 9 2 Outdoor Unit...
Страница 54: ...10 1 10 Schematic Diagrams 10 1 Indoor Unit...
Страница 55: ...10 2 10 2 Remote Control...