OPERATING INSTRUCTIONS
Measuring Voltages
Time spent operational at voltages above 220V must be less than
Time spent operational at voltages above 220V must be less than
60 seconds, with a cool-off time of at least 5 minutes.
5
600
480
220
120
120
Tester will turn on automatically when voltage is applied.
AC Voltage Measurement