
8
3. Attach a second set of vertical supports (A) and set the
vertical height (B). See “Installation Dimensions” in the
“Location Requirements” section to help determine the
desired dimension for vertical height “B.”
4. Attach the range hood assembly to the upper horizontal
support attached to the ceiling using 16 - 4 x 8 mm screws
and tighten.
Connect Vent System
1. Install vent system.
2. Push duct over the exhaust outlet. Seal all connections with
vent clamps.
Non-Vented (recirculating) Installation
1. Attach the air deflector to the upper horizontal support using
4 mounting screws.
2. Measure the length of 6" (15.2 cm) duct needed to connect
the transition to the deflector.
NOTE: Vent should fit up inside the deflector 1" (2.5 cm)
minimum.
3. Install vent between the transition and the deflector.
NOTE: To make vent installation easier, temporarily remove
the deflector from the chimney support bracket and replace
after vent section is in place.
4. Seal all connections with vent clamps.
Make Electrical Connection
1. Disconnect power.
2. Remove terminal box cover.
3. Remove the knockout in the terminal box cover and install a
UL listed or CSA approved
¹⁄₂
" strain relief.
4. Run home power supply cable through strain relief, into
terminal box.
A. Vertical suppoarts
B. Vertical height
A. Mounting screws
A. Deflector
B. Mounting screws
B
A
A
A
B
B
A
A. Knockout
B. Terminal box cover
A. Home power supply cable
B. UL listed or CSA approved strain relief
C. Black wires
D. UL listed wire connectors
E. White wires
F. Green (or bare) and yellow-green ground wires
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
A
B
A
B
C
D
E
F