8
1.
Open shutoff valve in the gas supply line. The valve is open
when the handle is parallel to the gas pipe.
Built-In Outdoor Grill Installation
(combustible construction)
Built-In Architect
TM
Series Outdoor Grill
Make gas connections
IMPORTANT:
The built-in outdoor grill for use in a combustible
enclosure, also includes an insulated jacket which must be used
for proper installation. See “Product Dimensions” section for cutout
dimensions.
1.
Place outdoor grill and insulated jacket into the enclosure, but
leave enough room between back of the outdoor grill and
insulated jacket to connect to gas supply and light plug.
A combination of pipe fi ttings must be used to connect the grill
to the existing gas line.
• If local codes permit, use an outdoor fl exible stainless steel
tubing gas connector, design-certifi ed by CSA International, to
connect the outdoor grill to the rigid gas supply line. 5/8
”
diameter line is recommended. Using a wrench to tighten,
connect the gas supply to the outdoor grill. Use pipe joint
compound on all non-fl ared male threads. Do not kink or
damage the fl exible connector when moving the outdoor grill.
• Pipe-joint compounds suitable for use with L.P. gas must be
used. Do not use Tefl on® tape.
rear of grill
fl exible gas
connector
1/2
”
grill
gas pipe
valve open
valve closed
® Tefl on is a registered trademark of E.I. Du Pont de Nemours and Company.
WARNING
Fire Hazard
Do not use grill near combustible materials.
Do not store combustible materials near grill.
Doing so can result in death or fire.
WARNING
Fire Hazard
Do not install this grill on or near combustible materials.
Doing so can result in death or fire.
WARNING
Excessive Weight Hazard
Use two or more people to move and install grill.
Failure to do so can result in back or other injury.
Natural Gas Use
This installation must conform with local codes and ordinances. In
the absence of local codes, installations must conform with either
the National Fuel Gas Code ANSI Z223.1 -latest edition, or
CAN/CGA-B149.1 Natural Gas and Propane installation code.
INSTALLATION INSTRUCTIONS
WARNING
Explosion Hazard
Use a new CSA International approved “outdoor”
gas supply line.
Securely tighten all gas connections.
If connected to LP, have a qualified person make sure
gas pressure does not exceed 11” (28 cm) water
column.
Examples of a qualified person include:
licensed heating personnel,
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion, or fire.
NOTE:
If grill has been converted to L.P. gas, follow instructions in
“If Converted to L.P. Gas” at the end of this section.