background image

4.2.4 When the motor is rolling up the plastics, the pipe arrives   
        at the required position, at this time rotate the knob which 
        controls the rolling status and make the gear pin touch the 
        micro switch( with click sound), hold on and fasten the lock
        bolt by a cross head screw-driver. 
4.2.5 When the motor is rolling down the plastics, the pipe arrives 
         at the required position, at this time rotate the knob which
         controls the rolling status and make the gear pin touch the 
         micro switch( with click sound) , hold on and fasten the lock
         bolt by a cross head screw-driver. 
4.2.6 The above steps would set up the motor’s limit range. Turn
         on the power and check if the range setup is correct. If it is
         not correct, please review the manual carefully and do the 
         setup again. 

5. Maintenance

5.1 Check the bolts on each connection regularly. Replace the 
      bolts which is deformed or snapped. 
5.2 No need to refill the gear oil during the life duration of this 
      product.  
 5.3 This product could be used for greenhouse rolling ventilation
      and curtaining system. For other usage, please consult our 
      company first. 

6. Common problems and solutions

  

1

Safty tips

1.1 The life of this roll-up would be extended by proper operation
      and maintenance, please kindly operate according to this
      manual strictly.  
1.2 This product needs DC24V input currency. Specialist or 
      electrician is needed to connect the power. Please don’t 
      connect 

AC220V or any other unspecified power, or there

      would be damage or fires. 
1.3 When the rolling pipe is rolling to high position with the plastics, 
      please don’t loosen this product with the pipe. Or the rolling 
      pipe will fall down fast and there would be possibility to hit 
      person or to cause damage to the product. 
1.4 Cut off the electricity when there is lightning or the motor 
      could be damaged. 
1.5 The rolling pipe could be at the same line with the motor 
      shaft. The curve of the pipe should not be too big, or the 
      motor could be damaged by overload. 
1.6 Please check and fasten the bolts connecting the electric 
      winch and its accessories; loose bolts will cause danger.
1.7 If the product didn’t work

 please don’t uninstall the part 

      inside; you should stop operating and contact the distributors 
      or the company.
1.8 Please don’t put the product into water and store it in moist 
      environment; the product could be damaged or cause danger
      to operators. If the products have water leaking inside, please
      stop operating and send it back to the factory for repair.
1.9 Please don’t toss or throw the products, it should be prevented
      from outside force.  

Содержание GMD120-D

Страница 1: ...KINGZO GMD120 D Electric Film Reeler Manual ...

Страница 2: ......

Страница 3: ...ls 1 set 2 1 5mm 2 2 5mm 2 4mm 2 4mm 2 6mm Each circuit controls 2 sets 2 4mm 2 4mm 2 6mm 2 10mm 2 16mm Each circuit controls 3 sets 2 4mm 2 6mm 2 10mm 2 16mm 2 16mm Each circuit controls 4 sets 2 6mm 2 10mm 2 16mm 2 16mm 2 25mm Notice Wire is the standard copper one 8 Wiring Distribution Table 10 ...

Страница 4: ...t No Problem Analysis 1 Motor doesn t rotate No power connection The left and the right knob touch the micro switch at the same time 2 Limit not accurate Lock bolts loose Inner parts damage 3 Noise Incorrect installation Overload 1 The packing list only contain the standard accessories and documents it doesn t include the other accessories you choose If you have ordered other accessories please ch...

Страница 5: ...e extended by proper operation and maintenance please kindly operate according to this manual strictly 1 2 This product needs DC24V input currency Specialist or electrician is needed to connect the power Please don t connect AC220V or any other unspecified power or there would be damage or fires 1 3 When the rolling pipe is rolling to high position with the plastics please don t loosen this produc...

Страница 6: ...en bolts CAUTION After the limit adjust is finished please fasten the bolts Or the limit will not be accurate and there would be dange of power shock 2 1 10 The user should keep the site clean and swipe the leaves or snow on the plastics to avoid overload damage 1 11 After the adjust is finished the user should fasten the bolts or there might be damage or accidents 1 12 Don t use the product over ...

Страница 7: ...cording to the correct installation diagram 3 4 2 Correct installation could guarantee the performance of the products 3 4 3 After the installation the motor should be above the limit switch at any position of the rolling 3 4 Installation diagram Figure 1 Figure 2 ...

Страница 8: ...er the installation the cable should be connect into the control box then turn on the power adjust the limit switch the proper position and then fasten the lock bolts 3 4 5 If there is power failure during the operation of the products and you would like to lower down the rolling pipe urgently you could hold the pipe first and loosen the connection between the pipe and the motor then lower the pip...

Отзывы: