1011026 User Manual Issue 01 (26.10.2021)
8
7.8.2.
Installation of Chemical Dosing System (where applicable)
Using a suitable M20 gland, feed the chemical dosing pump power cable through Gland Hole and terminate to
connection according to Figure 3 & Figure 4.
Connect the other end of the chemical dosing pump power supply cable to the junction box in the plant
(marked CHEMICAL DOSING).
Set the run and pause times for the chemical dosing pump as described in 10. 10Default Timetables
Completing the Installation
Complete all wiring according to Figure 4 DTP Control Panel Wiring (2)
Plug the lead from the battery into the small white socket below the battery on the PCB marked J3. After
finishing wiring, replace the isolator cover and screw. Turn the mains supply on at the source. Turn on the
panel using the isolation switch. It should now be illuminated
RED
. The display should now show text.
Replace the top cover and screws carefully so as not to damage buttons, ensuring the lid is fixed correctly.
Follow Guide in Section 8 Configuration Programming to enable programming.
Ancillary Equipment
Ancillary items should be installed in accordance with the Installation Guide supplied e.g. Sewage Pump
Station/Effluent Pump Station/Effluent Sample Chamber.
8.
Configuration Programming
Start Up
When the control unit is powered up for the first time, the display will prompt for the country to be selected.
Figure 6 Keys for Configuration
Figure 7 Initialisation