ZVFCV 39 / 42 Basic Finishing 3
Concrete Board Behind S2PF Surround (3/4” Maximum Total Thickness)
Step One:
Frame Fireplace with nailing tabs
oriented as shown (Flush with face of
fireplace).
Step Two:
Use Concrete Board to cover fireplace
face. NOTE: Optional ZCV-TLK Tile Kit is
available. Maintain clearances shown.
Step 3:
Concrete Board with optional Tile Lip
shown below.
Once wall is completely finished, Surround
may be installed.
IMPORTANT NOTE!:
If installing tile, brick, or
other non-combustible material around the
perimeter of the S2PF2 Surround, Maintain
clearances shown below.
Optional ZCV-TLK Tile Kit is available.
Also See Basic Finishing 4.
Nailing Tab
Fireplace
Opening
Fireplace
Opening
1-15/16” MIN
Optional ZCV-TLK Tile Kit
1-3/16” MIN
1
” M
IN
Concrete Board
Concrete
Board
Fireplace
Opening
Optional ZCV-TLK Tile Kit
1
” M
IN
1-3/16” MIN
Concrete
Board
Concrete Board
S2PF SURROUND
1
-3
/4
” M
IN
19