background image

BRICK CLIP AND SCREW 

LEFT AND RIGHT SIDE

REAR LOG PANEL

PLACE SIDE OF REFRACTORY PANELS

TIGHT AGAINST FIREBOX & 

TIGHTEN BRICK RETAINER CLIPS.

19

INSTALLING BRICK PANELS

FOR MODEL ZDV4224 AND

ZDV4228

1. PLACE REAR BRICK PANEL AGAINST

REAR OF FIREPLACE.

2.

LOOSEN SCREWS HOLDING BRICK 
CLIPS IN POSITION, ROTATE CLIPS UP
OUT OF THE WAY. PLACE SIDE BRICKS 
UP TO REAR BRICK AND FLUSH AGAINST
SIDE WALLOF FIREBOX. POSITION CLIPS
OVER BRICK AND TIGHTEN SCREWS.

Brick Installation

INSTALLING BRICK PANELS

FOR MODEL ZDV4232

1. REMOVE DOOR GLASS FROM THE

UNIT BY UNLATCHING THE 2
LATCHES ON TOP OF THE UNIT.

2. REMOVE THE FALSE BOTTOM

FROM THE UNIT BY LIFTING
STRAIGHT UP.  IT MAY NEED TO BE
WIGGLED.

3. PLACE REAR BRICK PANEL UP

AGAINST THE REAR OF THE
FIREBOX.

4. LOOSEN SCREW HOLDING BRICK

CLIP IN POSITION.  MOVE CLIP UP
OUT OF THE WAY AND PLACE SIDE
BRICK UP TO REAR BRICK AND
FLUSH AGAINST SIDE WALL OF
FIREBOX.  POSITION CLIP OVER
BRICK AND TIGHTEN SCREW.

5. REPLACE FALSE BOTTOM.

6. INSTALL LOG SET AS PER

INSTRUCTIONS AND RE-INSTALL
DOOR.

Содержание Zero Clearance ZDV4228LP

Страница 1: ...nvertible for use with other gases unless a certified kit is used Read this complete manual before beginning installation These instructions must be kept with the unit for future reference FOR YOUR SA...

Страница 2: ...tory However due to the high temperature sili cone components the paint will cure when heat is applied to the appliance as it is first used The following information applies to the curing process to g...

Страница 3: ...Millivolt System Lighting Burner Control 22 Brick Installation 23 Vent Termination 24 Venting Graph 25 General Vent Installation Information 26 Installation of Side Wall Venting 26 Venting Vertical 27...

Страница 4: ...de in Canada An appliance must be grounded to the steel chassis of the home with 8 ga copper wire using a serrated or star washer to penetrate paint or protective coating to insure grounding Use carri...

Страница 5: ...al should not be placed on or near the appliance This appliance should not be used as a drying rack for clothing nor should Christmas stockings or dec orations be hung from it 9 Under no circumstances...

Страница 6: ...f the vent system does not exceed 20 feet 6 1m When you install your fireplace as in position B D or E a minimum of 6 inches 153mm clearance must be maintained from the perpendicular wall and the fron...

Страница 7: ...e 4 When installing horizontal with a 90 degree bend maintain a minimum of 21 2 inches 64mm above the bend in enclosures 5 Hearth is not mandatory but is recommended for aesthetic purposes Combustible...

Страница 8: ...r to finish the mantel such paint or lacquer must be heat resistant 250 F to prevent discoloration Warning Combustible objects must not be placed on a non combustible mantel unless the non combustible...

Страница 9: ...sehold glass cleansers and warm water After that the glass should be cleaned two or three times a season depending on the circumstances Cautions and Warnings Do not clean when the glass is hot The use...

Страница 10: ...front log ember bed area 11 Front log should be centered on the log supports between the front and rear burners Pull log against the front of the supports 12 Top logs can then be placed across the fr...

Страница 11: ...ep 3 Verify to see that the ember plates 2 pcs are between front and back burner Step 4 Break glowing embers into thumbnail size Place glowing embers on to the surface of the front burner to the surfa...

Страница 12: ...crossover log across front and back logs using the log placement pin as a guide Step 8 Place left crossover log across front and back logs using the log placement pin as a guide Step 9 Place decorati...

Страница 13: ...C44 bend rear tabs 90 down Step 1 Position rear log over rear log holder and lower into position Be sure that the log does not sit on rear burner but behind and lower than burner Step 2 Locate flat su...

Страница 14: ...l from plastic bag tear off dime and nickel sized pieces and place directly onto front burner tube and crossover tube NOTE Do not place embers onto rear burner tube Step 5 Position Log 4 into grooved...

Страница 15: ...8 Slide Log 7 between Log 1 and Log 2 Step 9 Position Log 8 up against the 3rd grate post from the right and position upper section of Log 8 against Logs 2 and 7 Step 10 Place crushed rocks onto fire...

Страница 16: ...rear burner log mount and push back against tab STEP 5 Place Log 5 against grate bars and position Log 6 along side of Log 5 and onto Log 1 as shown in the photograph STEP 6 Place the narrow end of Lo...

Страница 17: ...over with face plate Electrical Services All optional fan kits are equipped with a 120V 60Hz blower Note All electric connections are to be made in accordance with CSA Standard C22 1 Canadian Electric...

Страница 18: ...turns the main burner on or off If main burner does not light immediately when you turn the gas control valve to ON ensure that the wall switch is in the ON position NOTE The On Off wall switch may b...

Страница 19: ...ON CLIPS OVER BRICK AND TIGHTEN SCREWS Brick Installation INSTALLING BRICK PANELS FOR MODEL ZDV4232 1 REMOVE DOOR GLASS FROM THE UNIT BY UNLATCHING THE 2 LATCHES ON TOP OF THE UNIT 2 REMOVE THE FALSE...

Страница 20: ...to prevent re circulation of exhaust products For additional requirements check local codes V NOTE Clearances are to the edge of terminal plate add 6 3 4 to clearances to arrive at center line NOTE L...

Страница 21: ...llowed 3 Vent table has been established for 90 horizontal vertical runs With use of flex pipe distance not having 90 bends will not fall into vent table standards See Fig B Horizontal Venting Table F...

Страница 22: ...thimble or an 8 diameter hole in a non combustible wall See Figure 2 2 Note clearance to combustible above 90 degree bend is 21 2 3 Select the approximate vent length precise measurements are not need...

Страница 23: ...Attic Insulation Shield where the chimney passes from a living space to an attic space install the shield from below and nail in place using 1 spiral nails 3 A fire stop must be installed on the bott...

Страница 24: ...e Retighten screw Reinstall burner at this time reversing STEPS 3 2 and 1 Step 11 Follow instructions supplied with the conver sion HI LOW to convert the valve from one type of fuel to the other Step...

Страница 25: ...of the injector 2 and rotate it counter clockwise until it is free of the injector journal 3 5 Verify that the new injector is proper for the application The injector size is stamped on the side of th...

Страница 26: ...SIT Valve System Parts If Serial Number is GREATER than above New Top Convertible SIT SYSTEM 1000 P136WR Thermopile GOAI 524 1001 P069SI Electrode Sparker 915 069 TC SIT 1001 P216SI Thermocouple 290 2...

Страница 27: ...CR Surround Chrome Coverage 36 5 8 H x 45 1 8 W Z42SPB Surround Polish Brass Coverage 36 5 8 H x 45 1 8 W Z42SLAB Surround Slim Line Antique Brass Coverage 36 3 8 H x 43 3 8 W Z42SLCR Surround Slim Li...

Страница 28: ...rminals at wall switch If burner comes on replace defective Switch ON wall switch If okay jumper wires across wall switch wires at valve If burner comes on wires are faulty or connections are bad Gene...

Страница 29: ...service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoeve...

Отзывы: