KILN care Hobbyfuser 3 Скачать руководство пользователя страница 8

Page 

 

 

                                                            Hobbyfuser 3 Manual 

where the glass can touch with a separator. 
 
Once the kiln has been loaded with the glass to be fired, lower the lid and 
clamp shut the clasp to ensure the lid seal remains tight throughout the firing. 
Plug the kiln into a 13 amp wall socket outlet.  
 
Enter the firing cycle and start the KCR2. 
 

       
     What to expect on the initial firing 
 

Once the KCR2 has been stated and after a slight delay a red dot will appear 
on the controller display and a quiet click will be heard from the KCR12 This is 
the internal relay of the controller turning the kiln power on. 
This click will be heard to click on and off at various points through the cycle as 
the KCR2 regulates the kiln temperature. 
 
As mentioned on previous pages, a slight odour will be released and the  
insulation binders burn out. 
 
 

      Looking after your kiln 
 

REMEMBER, the kiln is for stained glass applications, fusing and slumping. IT 
IS NOT A MOULD DRYER.  
Moulds used for slumping contain a huge amount of water, it is recommended 
that the mould is thoroughly dried prior to insertion in the kiln. The kiln will  
operate with a wet mould in it but the kiln was not designed to expel large  
quantities of water vapour from its chamber. Continued use of wet moulds in 
the kiln chamber could result in premature deterioration of the kiln structure.  
 
Care must be taken not to load the kiln to a height that will result in the  
elements being closed on to the load. This invariably results in broken element 
tubes.  
 
When shutting the kiln lid, gentle operation will also prevent accidents. 
 
The lid insulation of your Hobbyfuser 

is press cut and then machined together  

under pressure to ensure that the insulation is fitted to its maximum strength 
and to ensure many years of service. This process does mean that extra care is 
needed to keep the brick tops clear of objects when closing the lid as repairs to 
the lid seal are difficult and may result in the lid needing to be re-lined.  
 

Содержание Hobbyfuser 3

Страница 1: ...Instructions...

Страница 2: ...fully to get to know your kiln before use Index Page Safety notices Your Hobbyfuser 3 is designed and built to meet all European Directives and British Standards In addition your kiln is designed spec...

Страница 3: ...ternal cables are damaged Have the kiln tested by a competent person at least every 12 months Never turn the power on to the kiln when the KCR2 is not plugged in Hot Surfaces The kiln will have hot su...

Страница 4: ...iven to siting with regard to the safety of children and pets It is advised that the kiln is left untouched until the kiln has finished it s given program and fully cooled Remember whilst the kiln is...

Страница 5: ...e required to be Portable Appliance Tested along with other electrical items It is important that the KCR2 controller is disconnected before testing or there is a risk of the high voltage associated w...

Страница 6: ...ontrol The KCR2 controller supplied with this kiln has already been set and the characteristics of the kiln have been entered in to it The kiln and the KCR2 will have already been put through a test f...

Страница 7: ...tions when returning to it We do not recommend cooling in this manner above 100c Loading Load the kiln with the glass items that are to be fired Remember glass will stick to the bricks so a separating...

Страница 8: ...cations fusing and slumping IT IS NOT A MOULD DRYER Moulds used for slumping contain a huge amount of water it is recommended that the mould is thoroughly dried prior to insertion in the kiln The kiln...

Страница 9: ...f brick then slide in the new one The kiln can then be used immediately Remember always wear a dust mask and carry out work in a well ventilated area when repairing or replacing refractory items that...

Страница 10: ...e gloves provided From the left hand side of the kiln slide in the new element Take care and be gentle even though the tubes have a high strength once in position they can be chipped or crack if handl...

Страница 11: ...h program has 9 segments Press the step key The main display shows the program number for instance Pr 1 The segment display shows 1 Use the up or down keys to select the program required Press step Th...

Страница 12: ...icated firings carry on as above by setting the next time temperature and dwell When you have programmed all you require select END at the start of the following segment After a few seconds the displa...

Страница 13: ...ved on to the next section or end using this key To view entered program data This can be done whether the kiln is firing or not Press the step key each press will forward the display to the next sect...

Страница 14: ...150 538 00 00 200 700 00 15 FULL 538 00 15 182 427 00 00 3 6mm Bullseye Fuse 222 677 00 30 333 795 00 10 FULL 482 01 00 83 371 00 01 4 6mm Bullseye Slump 167 640 00 10 FULL 482 01 00 56 371 00 01 END...

Страница 15: ...he right hand lid element panel there are two tilt switches which shut off as the lid opens The lid has to be in the closed position before the tilt switches will allow the elements to heat If the abo...

Страница 16: ...nlikely that the work will see any ill effects If the inside of the kiln is clearly visible when the kiln is at temperature then you may need to return the lid or hole kiln to Kilncare for relining Ba...

Страница 17: ...Hobbyfuser 3 Manual Page 17 Notes...

Страница 18: ...Page Hobbyfuser 3 Manual 18...

Страница 19: ...netic Compatibility Directive 2004 108 EC The equipment is intended for use only in premises having a service current capacity of 100 A per phase supplied from a distribution network having a nominal...

Страница 20: ...Hobbyfuser 3 Instruction Manual 2019...

Отзывы: