PD05M-PCR-LE/PD05S-PCR-LE 5
Connecting the Load
Connect the the relay terminal board to the load with output cables.
WARNING
Risk of electric shock. Before you connect cables to the
terminals, be sure to turn the POWER switch off, and
then remove the power plug from the outlet or turn off
the switchboard.
CAUTION
Risk of malfunction.
• Do not reverse the L and N polarities.
• Use noncombustible cables with a thickness appropriate
for the output current to connect from the relay terminal to
the load.
Performing Master-Slave Parallel
Operation
Master-slave parallel operation is controlled from the master unit.
The master unit displays the total output current of the system.
For details of settings, see the operation manual included with the
PCR-LE series.
The screen captures used in the PCR-LE series operation manual
are examples. They may differ from the screens that are displayed
when you are setting parallel operation.
To Stop master-slave parallel operation
To quit master-slave parallel operation, turn off the power, remove
the boards and power signal cables from the PCR-LE Series.Hold
down the locking tab of the power-signal cable, and pull it free of
the unit.
If the current limit setting on the master unit exceeds the rated cur-
rent and you turn the POWER switch on after removing the board,
the current limit will be changed to the maximum value for that