Kikusui LP01-TOS Скачать руководство пользователя страница 3

LP01/02-TOS

3

Inspection Before Starting

Always inspect and confirm the following items before beginning an actual test.

If any abnormality or failure is found in the “Inspection Before Starting,” immediately

stop using the test probe and contact your Kikusui distributor or agent for repairs.

Test probe cable and LOW test lead

Check for broken sheathing and loose or cracked connectors.

Confirm electrical continuity.

Start switch

Confirm that the switch operates smoothly when pressed.

Contact pin

Check for any signs of damage.

Check the pin for loose connection.

LP01-TOS

LP02-TOS

1.

2.

3.

The pin is correctly 
attached.

The pin connection 
is loose.

Pin adjustment

1.

Turn the holder counter clockwise.

2.

Turn the pin fully clockwise.

3.

Turn the holder fully counter clockwise.

Содержание LP01-TOS

Страница 1: ...r earth continuity testers The test probe is designed specifically for use with a KIKUSUI Earth Continu ity Tester It cannot be used with other earth continuity testers even if the connector appears t...

Страница 2: ...from the switch will stop testing Contact Pin Test current is delivered to this pin contacting a test point of the DUT Holder This part holds the contact pin OUTPUT LED This red LED indicates that te...

Страница 3: ...epairs Test probe cable and LOW test lead Check for broken sheathing and loose or cracked connectors Confirm electrical continuity Start switch Confirm that the switch operates smoothly when pressed C...

Страница 4: ...OUTPUT LED does not light The on off status of the OUTPUT LED of the test probe is inconsistent with that of the TEST LED on the Tester The OUTPUT LED remains lit even when you release your finger fr...

Страница 5: ...e LOW terminal of the Tester 4 Connect the each cable of the test probe to the HIGH and REMOTE termi nal of the Tester Connecting the remote control cable starts or stops testing as indicated below Te...

Страница 6: ...nect the alligator clip of the LOW test lead to the protective conductor terminal of the DUT 2 Apply the contact pin of the test probe to the test point of the DUT 3 Depress the START switch This caus...

Страница 7: ...i distributor or agent Specifications 1 The rated maximum voltage current refers to the maximum voltage current the test probe is capable of handling within the given operating temperature and humidit...

Страница 8: ...e equipment and quantity SJ T 11364 GB T 26572 GB T 26572 Environment friendly Use Period Pb Hg Cd Cr VI PBB PBDE LP01 TOS LP02 TOS KIKUSUI ELECTRONICS CORP www kikusui co jp en 1 1 3 Higashiyamata Ts...

Отзывы: