Page 10 / 16
Product Description
MD15/230-HR, MD15/230-HE, MD15/230-DA
3.09-20.250-01-EN | 2018-08-06
Q
►
Place the actuator on the threaded connection of the valve and tighten hand-tight using the union
nut.
►
Establish the electrical connection.
►
The first time the line power is switched on, an automatic initialization run takes place. The
actuator first travels to the upper end position and then to the lower end position. The valve is now
adapted.
The actuator will not respond to the control signal until the initialization run is complete.
!
CAUTION
After recommissioning or a manual adjustment, an initialization run must be triggered manually. This
is done by flipping the DIP switch before switching on the power supply (see Fig. 6).
Installation: MD15/230-DA
1
2
3
5
6
7
≤ 90°
1
2
3
4
5
6
7
1
2
3
8