22
Flush to edge
Overlap cedar roofing
S0
1930
1930
S0
x 36 per side
1-1/2”
for bottom row
only (each side)
Roof Supports
removed for
clarity
Flush to edge
1424
1424
Step 6: Roof Assembly
Part 2
D:
Starting at the top of the Roof Support Assembly attach 1 (1930) Siding on each side of the (1424) Roof
Supports and (1425) Roof Joists with 3 (S0) #8 x 7/8” Truss Screws per board. (fig. 6.2) Be sure to overlap the top
of the boards so there are no gaps. (fig. 6.3)
E:
Drill a hole 1-1/2” up from the bottom of the 2 bottom (1930) Siding (for bottom row only).
Attach 1 (1930)
Siding at the bottom of the Roof Support Assembly on each side, making sure they are flush to each (1424) Roof
Support with 3 (S0) #8 x 7/8” Truss Screws. (fig. 6.2 and 6.4)
F:
On one side of the assembly evenly space and attach 10 (1930) Siding, leaving no gaps, with 3 (S0) #8 x 7/8”
Truss Screws per board. There should be 12 (1930) Siding on this side. (fig. 6.2)
G:
On the other side of the assembly evenly space and attach 10 (1930) Siding, leaving no gaps, with 3 (S0) #8 x
7/8” Truss Screws per board. (fig. 6.2)
Fig. 6.2
Wood Parts
Hardware
72 x
#8 x 7/8” Truss Screw
24 x
Siding 3/8 x 3-1/2 x 41-1/2”
1930
S0
Fig. 6.3
Fig. 6.4
1425
Содержание F23220
Страница 55: ...55 NOTES NOTES...