![KidKraft CRANBROOK PLAY SYSTEM Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/kidkraft/cranbrook-play-system/cranbrook-play-system_installation-and-operating-instructions-manual_1965927043.webp)
43
Step 20: Upper Swing Wall Assembly
Hardware
Wood Parts
7 x
Cedar Wall 1 x 4 x 28”
5265
28 x
#8 x 1-1/2” Wood Screw
A:
In between both (2383) Posts on Swing Wall side attach 7 (5265) Cedar Walls to (2370) Floor Back and
(2389) SW Back using 4 (S2) #8 x 1-1/2” Wood Screws per board. Make sure the bottom of the boards are
tight against the floor boards and the bevelled ends are at the top and facing out. Evenly space boards as
shown below. Spacing must not exceed 3” in between all boards. (fig. 20.1, 20.2 and 20.3)
Fig. 20.2
Fig. 20.1
5265
2389
2383
x 4 per
board
Bevelled edges
facing out
Swing Wall
S2
2370
Not to
exceed 3”
2383
S2
5265
x 7
Tight
Fig. 20.3
Содержание CRANBROOK PLAY SYSTEM
Страница 75: ...NOTES 75...