Step 4
Side with
Overhang
H8
G5
G8
1 x
2 x 4 x 5-3/8”
4919
Hardware
Wood Parts
1 x
1/4 x 4-1/4”
(LW1, FW1, TN1)
1 x
5/16 x 4-1/2”
(LW2, FW2, TN2)
1 x
5/16 x 2”
(FW2 x 2, LN2)
H8
G5
G8
Step 3: Swing Beam Assembly
1X H2 (LW1, FW1, TN1)
1x G5 (LW2, FW2, TN2)
1x G8 (FW2 x2, TN2)
Notes:
-Install T-Nuts first!
hammer, 7/16" socket, 1/2" wrench
icon
4919
TN1
TN2
LN2
LW2
LW1
FW2
FW1
FW2
2
2
1
1773
1772
19
Содержание BILT F26415EDB
Страница 37: ...Step 14A Hardware Wood Parts 4 x 8 x 1 1 8 S1 1 x 1 x 4 x 31 1 2 1754 1754 3 76 2mm FRONT S1 S1 1754 37...
Страница 38: ...Step 14B Hardware 4 x 8 x 1 2 FW3 S5 S5 FRONT FW3 S5 S5 S5 S5 38...
Страница 39: ...FRONT 3x S5 FW3 Step 14C Hardware 3 x 8 x 1 2 FW3 S5 FW3 S5 S5 S5 S5 39...
Страница 48: ...Step 19C Step 18c Canopy Roof Assembly cont 48...
Страница 49: ...S5 S5 S5 S5 S5 S5 S5 S5 S5 Hardware 8 x 8 x 1 2 FW3 S5 Step 19D FW3 49...