Mounting Instructions
When selecting a location to mount your Kicker KQ30 equalizer be sure it is structurally sound and that there are
no items behind the area that could be damaged by the screws. Check for wiring, brake lines, fuel lines, gas tanks,
etc.
Remember that the controls on top of the equalizer will need to be accessible for adjustment later. Keep this in
mind as you choose your equalizer’s mounting location.
Now that you are ready to mount your equalizer, use the KQ30 chassis as a template and mark the four mounting
hole locations with a marking pen or pencil.
30
Pen or Pencil
Next, remove the KQ30 from the mounting location and using a drill with a 7/64 inch drill bit, pre-drill the four
mounting locations you marked in the above step.
7/64 inch Drill Bit
EQ removed
from mounting
location.
Pre-drill the
four holes
marked in
previous step.
30
Screwdriver
Finally, using the supplied screws and a phillips head screw driver, mount the KQ30 into it’s new home.
KQ30 Equalizer Technical Manual
Version 1.0
January 1, 2002 Page 7