
Fig. 9
Fig. 10
HANGING THE FAN
(continued)
Step 8. Slip the coupling cover, canopy cover and canopy onto the
downrod. (Fig. 9)
Thread the hanger ball onto the downrod, insert the cross pin
through the downrod and tighten. Now tighten the set screw.
Step 9. Lift the motor assembly into position and place the hanger
ball into the ceiling mounting bracket.
Rotate the entire assembly until the "Check Tab" has dropped into
the "Registration Slot" and seats firmly. (Fig. 10)
The entire motor assembly should not rotate (left or right) when
seated properly.
WARNING:
Failure to reattach the cross pin and seat the "Check
Tab" can cause the fan to fall from the ceiling during operation. Take
special care to make sure this pin is reattached.
Registration slot
Downrod
Canopy
Canopy cover
Set screws
Reverse switch
Hitch pin
Retaining
clip
Coupling cover
13" EYRIE
TM
| 9
Содержание EYRIE
Страница 1: ...13 EYRIE TM INSTRUCTION MANUAL Product images may vary slightly from actual product ...
Страница 2: ......
Страница 20: ...13 EYRIE MANUEL D INSTRUCTIONS Les images du produit peuvent différer légèrement du produit réel ...
Страница 21: ......
Страница 39: ...13 EYRIE MANUAL DE INSTRUCCIONES Las imágenes del producto pueden variar ligeramente del producto real ...
Страница 40: ......