![Keysight M5200A Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/keysight/m5200a/m5200a_startup-manual_1961126030.webp)
30
M5200A PXIe Digitizer Modules Startup Guide
2
Setting up the M5200A module
Section 2.1: Unpacking, Inspecting and Verifying the shipment
The module arrives packed in one small box. Before unpacking your
module(s), inspect the packaging container for evidence of mishandling
during transit. Inspect the carton carefully for any damage, or signs of
rough handling.
Remove the M5200A module from the packaging container and ensure
that all accessories are included. Inspect the module and accessories for
damage. If the contents appear damaged, notify your local Keysight
Technologies Inc. representative.
2.1.1: Precautions against ESD
Electrostatic discharge (ESD) can damage or destroy electronic
components. Use a static-safe workstation to perform all work on
electronic assemblies.
shows a static-safe workstation using two
types of ESD protection:
Figure 4
Static-safe workstation for ESD protection
• Conductive table-mat and wrist-strap combination
• Conductive floor-mat and heel-strap combination
CAUTION
The module is shipped in materials which prevent damage from static.
The module should only be removed from the packaging in an anti-static
area ensuring that correct anti-static precautions are taken. Store the
module in an anti-static envelope when not in use.
Содержание M5200A
Страница 1: ...0 3 H LJLWL HU 0RGXOHV RXU VD VHF ELWV UHVROXWLRQ 67 5783 8 ...
Страница 8: ...8 M5200A PXIe Digitizer Modules Startup Guide ...
Страница 12: ...12 M5200A PXIe Digitizer Modules Startup Guide Contents ...
Страница 28: ...28 M5200A PXIe Digitizer Modules Startup Guide 1 Overview on M5200A PXIe Digitizer Modules ...
Страница 70: ...70 M5200A PXIe Digitizer Modules Startup Guide 3 Setting up the M5200x software ...
Страница 79: ...M5200A PXIe Digitizer Modules Startup Guide 79 ...