C
HAPTER
4
How do I...
This section describes the tasks needed to set up the UHD100T32 fixed chassis for operation and to
configure it for operation in your network.
Section contents:
Unpack UHD100T32
You need to unpack the unit before physically setting it up for operation. To unpack, do the following:
1. Unpack the unit from the shipping container, and verify that you have all the required
components.
The shipping carton contains the following items:
l
One UHD100T32 fixed chassis
l
One rack mounting kit (two front-post brackets, two rear-post brackets, 20 screws, two ear-
locking screws)
l
Two 90-240VAC power cords
l
One RJ45 to DB9-F cable
l
One USB to DB9-M adapter
l
Ixia standard warranty notice
– 13 –
913-2626-01
Содержание ixia UHD100T32
Страница 1: ...UHD100T32 Release 1 0 Getting Started Guide 913 2626 01 Document version 202006021842 05 30...
Страница 3: ...This page intentionally left blank 913 2626 01 iii...
Страница 7: ...Shut down UHD100T32 29 Chapter 5 FAQs 31 INDEX 33 913 2626 01 vii...
Страница 9: ...This page intentionally left blank 913 2626 01 9...
Страница 25: ...This page intentionally left blank 913 2626 01 12...
Страница 43: ...This page intentionally left blank 913 2626 01 30...
Страница 45: ...This page intentionally left blank 913 2626 01 32...
Страница 48: ...Ixia a Keysight Business 26601 West Agoura Road Calabasas California 91302 Keysight Technologies 2018 2020...