Keysight 8478B Thermistor Mount 39
Maintenance
Thermistor Compensation
3. Turn screws (B) clockwise, 1/8 turn alternately.
4.
When meter pointer rises, trim to zero with each adjusting screw.
5. Replace terminal shield and three screws (A). The instrument is now
operative.
The compensating screws are in very close proximity to the thermistors
themselves. Thermistor damage can easily occur if the screws are forced
in any way.
If there is a sudden jump in meter indication when advancing either screw,
back off 1/8 turn, and do not advance that screw further. Check resistance
as in
“If meter remains pegged downscale, measure resistance between
pins 1 and 2, and pins 3 and 4. The resistance should measure between
1000 and 5000 ohms. An open or shorted reading indicates the need for
replacement of the thermistors.” on page 37
. If either screw bottoms, do
not apply force. Thermistor replacement is indicated.
Содержание 8478B
Страница 1: ...Operating and Service Manual Keysight 8478B Thermistor Mount ...
Страница 6: ...6 Keysight 8478B Thermistor Mount Certification Sales and Technical Support ...
Страница 12: ...12 Keysight 8478B Thermistor Mount General Information Incoming Inspection 1 ...
Страница 40: ...40 Keysight 8478B Thermistor Mount Maintenance Thermistor Compensation 4 Figure 4 5 Thermistor Mount Assembly ...