U3020AS16
Controlling the Test Set
Test Set Control Commands
The Test Set has predefine sequence command sets defined at the factory and
stored in the non-volatile memory of the controller module. If the specified
sequence name is not currently stored in the memory, due to corrupted
program or accidentally deleted, an error will be generated. Refer to the
Service section of this manual for instructions to remedy this issue.
Syntax
:
ROUTe:SEQuence:TRIGger <command>
Parameters
:
Refer to
for commands use to control the Test Set’s programmable
switches.
Measurement Setup Example
:
With the following sequence commands, "
rp4" and "tp14
"
,
the Test Set will
position the internal RF switches to create the signal paths needed to
measure the DUT shown in
. All unselected front panel ports will be
terminated by an internal RF switch 50 Ohm load.
In this example we will configure the system to make an S21 measurement.
Network Analyzer Port 1 is the source output port and Port 2 is the receiver
port.
Command: ROUT:SEQ:TRIG
rp4
;
tp14
"
rp4
" will create a signal path from
Refl Port to Port 4
.
"
tp14
" will create a signal path from
Trans Port to Port 14
.
Figure 4
Measurement Example
Port 1
Port 2
REFL
TRANS
P4
P14
DUT
Test Set
NWA
16
Keysight U3020AS16 User's and Service Guide